Fuzzy Comprehensive Risk Evaluation of China’s Metro Transportation Public-Private Partnership Projects

Abstract The Public-Private Partnership (PPP) model has been widely adopted in China’s metro infrastructure to enhance resource allocation efficiency. However, PPP projects have a long life cycle and diverse risk factors, and effective risk assessment is thereby essential to achieve project success. This study develops a fuzzy comprehensive risk evaluation model by integrating the Analytic Hierarchy Process (AHP) and Fuzzy Comprehensive Evaluation methods. A comprehensive risk indicator set consisting of 11 dimensions and 45 indicators is established, and AHP method is applied to calculate indicators importance weights. Subsequently, the weights are combined with fuzzy mathematical theory to quantitatively assess the risk levels by calculating the risk level scores. Then, by applying this model to the Tianjin Metro Line 7 Phase 1 project, the study identifies that political, construction phase, financing phase, economic, and legal risks as the five key risk indicators, while external and social risks are found to be less significant. The overall project risk level is assessed as above-moderate. Moreover, expert interpretation is conducted to discuss results and propose risk management strategies for key risk indicators. This study validates the fuzzy comprehensive risk evaluation model through case application, provides practical reference for risk management in PPP metro projects.

Authors

Institutions

Publication Details

Journal
Civil and Environmental Engineering
Published
2025-06-16
DOI
https://doi.org/10.2478/cee-2025-0056
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Fuzzy Comprehensive Risk Evaluation of China’s Metro Transportation Public-Private Partnership Projects

Djoen San Santoso, Jiayi Yu
Civil and Environmental Engineering
Public-Private Partnership Projects
article

Fuzzy Comprehensive Risk Evaluation of China’s Metro Transportation Public-Private Partnership Projects

Djoen San Santoso, Jiayi Yu
article en

Abstract

Abstract The Public-Private Partnership (PPP) model has been widely adopted in China’s metro infrastructure to enhance resource allocation efficiency. However, PPP projects have a long life cycle and diverse risk factors, and effective risk assessment is thereby essential to achieve project success. This study develops a fuzzy comprehensive risk evaluation model by integrating the Analytic Hierarchy Process (AHP) and Fuzzy Comprehensive Evaluation methods. A comprehensive risk indicator set consisting of 11 dimensions and 45 indicators is established, and AHP method is applied to calculate indicators importance weights. Subsequently, the weights are combined with fuzzy mathematical theory to quantitatively assess the risk levels by calculating the risk level scores. Then, by applying this model to the Tianjin Metro Line 7 Phase 1 project, the study identifies that political, construction phase, financing phase, economic, and legal risks as the five key risk indicators, while external and social risks are found to be less significant. The overall project risk level is assessed as above-moderate. Moreover, expert interpretation is conducted to discuss results and propose risk management strategies for key risk indicators. This study validates the fuzzy comprehensive risk evaluation model through case application, provides practical reference for risk management in PPP metro projects.

Civil and Environmental EngineeringVol. 21(2)
Asian Institute of Technology (TH)
Partnerships for the goals
Openalex Percentile: Top 79%
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.