Further discussion on the Open Building of Beijing No. 1 Thermal Power Plant at the Environmental, Social, and Governance Levels

In recent years, China has placed significant emphasis on the transformation and redevelopment of old factories. The transformation of Beijing No. 1 Thermal Power Plant, guided by Open Building Theory and ESG Strategy, holds even greater practical significance. This paper attempts to explore sustainable methods of integrating the Open Building Theory and ESG strategies in the renewal process of old industrial plants. The paper proposes the Urban Renewal Topology Strategy of Open Building (O-ESG), and conducts an application design with Beijing No.1 Thermal Power Plant as a test case. The test shows that the O-ESG strategy can be applied in the transformation design of old industrial plants. The paper concludes that ESG may become a breakthrough point for the Open Building Theory, and the O-ESG strategy may become a sustainable method in the renewal process of old industrial plants.

Authors

Publication Details

Journal
CIB Conferences
Published
2025-06-19
DOI
https://doi.org/10.7771/3067-4883.1971
Primary Topic
Regional Development and Environment
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Further discussion on the Open Building of Beijing No. 1 Thermal Power Plant at the Environmental, Social, and Governance Levels

Yitong Wang, Zirui Wang, Wen Ouyang
CIB Conferences
Regional Development and Environment
article

Further discussion on the Open Building of Beijing No. 1 Thermal Power Plant at the Environmental, Social, and Governance Levels

Yitong Wang, Zirui Wang, Wen Ouyang
article en

Abstract

In recent years, China has placed significant emphasis on the transformation and redevelopment of old factories. The transformation of Beijing No. 1 Thermal Power Plant, guided by Open Building Theory and ESG Strategy, holds even greater practical significance. This paper attempts to explore sustainable methods of integrating the Open Building Theory and ESG strategies in the renewal process of old industrial plants. The paper proposes the Urban Renewal Topology Strategy of Open Building (O-ESG), and conducts an application design with Beijing No.1 Thermal Power Plant as a test case. The test shows that the O-ESG strategy can be applied in the transformation design of old industrial plants. The paper concludes that ESG may become a breakthrough point for the Open Building Theory, and the O-ESG strategy may become a sustainable method in the renewal process of old industrial plants.

CIB ConferencesVol. 1(1)
Openalex Percentile: Top 81%
Regional Development and Environment
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Further discussion on the Open Building of Beijing No. 1 Thermal Power Plant at the Environmental, Social, and Governance Levels — Yitong Wang, Zirui Wang, et al. · CIB Conferences (2025) | TGRS Research Map | TGRS