Evaluation of Temporary Structures Contractual Frameworks: An Industry-Wide Survey Study

Temporary structures are integral to construction. Yet, the complexities and risks associated with these structures often need to be more adequately addressed in standard construction manager/general contractor (CM/GC) contracts. This gap in practice underscores the need for an in-depth exploration of contractual challenges and potential improvements related to temporary structures. This study investigated the barriers to including comprehensive risk provisions in standard CM/GC contracts for temporary structures and assessed industry professionals' perspectives on their effectiveness and potential improvements. Employing a survey questionnaire distributed across all 50 states in the United States, the research garnered 465 valid responses from various industry sectors and organizational sizes. The findings reveal a significant consensus among professionals regarding the inadequacy of current CM/GC standard contracts in addressing the risks of temporary structures. Over half of the respondents attribute this gap to a transfer of liability to construction contractors, while others cite strategic avoidance of comprehensive terms to prevent legal disputes. Interestingly, most respondents acknowledge the importance of incorporating detailed contractual provisions for quality, safety, and environmental issues, recognizing their role in enhancing contractual robustness. However, opinions are divided on the need to detail owner/client responsibilities and the effectiveness of provisions for schedule and price impacts. The study suggests an industry-wide need for more robust contractual terms, particularly in managing legal obligations and specific risk types associated with temporary structures. These insights contribute to understanding the current contractual challenges and pave the way for adopting innovative contractual frameworks in the construction industry.

Authors

Publication Details

Journal
CIB Conferences
Published
2025-06-19
DOI
https://doi.org/10.7771/3067-4883.1020
Primary Topic
Business Process Modeling and Analysis
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Evaluation of Temporary Structures Contractual Frameworks: An Industry-Wide Survey Study

John Gambatese, Ali E Esmail, Abdulaziz Alotaibi
1 links
CIB Conferences
Business Process Modeling and Analysis
article

Evaluation of Temporary Structures Contractual Frameworks: An Industry-Wide Survey Study

John Gambatese, Ali E Esmail, Abdulaziz Alotaibi
article en

Abstract

Temporary structures are integral to construction. Yet, the complexities and risks associated with these structures often need to be more adequately addressed in standard construction manager/general contractor (CM/GC) contracts. This gap in practice underscores the need for an in-depth exploration of contractual challenges and potential improvements related to temporary structures. This study investigated the barriers to including comprehensive risk provisions in standard CM/GC contracts for temporary structures and assessed industry professionals' perspectives on their effectiveness and potential improvements. Employing a survey questionnaire distributed across all 50 states in the United States, the research garnered 465 valid responses from various industry sectors and organizational sizes. The findings reveal a significant consensus among professionals regarding the inadequacy of current CM/GC standard contracts in addressing the risks of temporary structures. Over half of the respondents attribute this gap to a transfer of liability to construction contractors, while others cite strategic avoidance of comprehensive terms to prevent legal disputes. Interestingly, most respondents acknowledge the importance of incorporating detailed contractual provisions for quality, safety, and environmental issues, recognizing their role in enhancing contractual robustness. However, opinions are divided on the need to detail owner/client responsibilities and the effectiveness of provisions for schedule and price impacts. The study suggests an industry-wide need for more robust contractual terms, particularly in managing legal obligations and specific risk types associated with temporary structures. These insights contribute to understanding the current contractual challenges and pave the way for adopting innovative contractual frameworks in the construction industry.

CIB ConferencesVol. 1(1)
Openalex Percentile: Top 76%
Business Process Modeling and Analysis
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Evaluation of Temporary Structures Contractual Frameworks: An Industry-Wide Survey Study — John Gambatese, Ali E Esmail, et al. · CIB Conferences (2025) | TGRS Research Map | TGRS