Opportunities and Challenges for Early Involvement of Trade Partners during the Design Phase of Construction Projects

Outcomes during the execution of construction processes and methods are dependent on the details generated during the design process. A holistic analysis and selection of design alternatives by all key participants early in the design can enhance construction efficiency and outcomes. However, trade partners responsible for implementing more than 80% of building construction scopes are underutilized in developing the detials associated with the system designs. This limitation lowers the ability to optimize the design while the potential to influence cost and other client value items is still high. It also remains unclear how trade partners can be effectively engaged early in this design process. This study seeks to identify how trade partners contribute to the design process to meet anticipated target value outcomes. We collected data through in-depth interviews with seventeen subject matter experts to identify the responcibilities, benefits, and challenges to effective early involvement of trade partners in the design process. The findings suggest that trade partners provide the best value outcomes when their input is sought early, notably from the conceptual design stage. Trade partners with critical scopes can drive the project towards higher cost certainty, better constructability, and streamlined design and construction processes. The commonly cited trades for early involvement are electrical, mechanical, steel, concrete, and plumbing. However, their involvement requires a shift from the current embedded low-bid and siloed culture in the industry to a more value-based collaborative approach. In practice, both design and construction practitioners should better support each other’s roles and responsibilities during this collaborative process.

Authors

Institutions

Publication Details

Journal
CIB Conferences
Published
2025-06-19
DOI
https://doi.org/10.7771/3067-4883.1875
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Opportunities and Challenges for Early Involvement of Trade Partners during the Design Phase of Construction Projects

Lorine A Ouma, Robert Leicht
CIB Conferences
Construction Project Management and Performance
article

Opportunities and Challenges for Early Involvement of Trade Partners during the Design Phase of Construction Projects

Lorine A Ouma, Robert Leicht
article en

Abstract

Outcomes during the execution of construction processes and methods are dependent on the details generated during the design process. A holistic analysis and selection of design alternatives by all key participants early in the design can enhance construction efficiency and outcomes. However, trade partners responsible for implementing more than 80% of building construction scopes are underutilized in developing the detials associated with the system designs. This limitation lowers the ability to optimize the design while the potential to influence cost and other client value items is still high. It also remains unclear how trade partners can be effectively engaged early in this design process. This study seeks to identify how trade partners contribute to the design process to meet anticipated target value outcomes. We collected data through in-depth interviews with seventeen subject matter experts to identify the responcibilities, benefits, and challenges to effective early involvement of trade partners in the design process. The findings suggest that trade partners provide the best value outcomes when their input is sought early, notably from the conceptual design stage. Trade partners with critical scopes can drive the project towards higher cost certainty, better constructability, and streamlined design and construction processes. The commonly cited trades for early involvement are electrical, mechanical, steel, concrete, and plumbing. However, their involvement requires a shift from the current embedded low-bid and siloed culture in the industry to a more value-based collaborative approach. In practice, both design and construction practitioners should better support each other’s roles and responsibilities during this collaborative process.

CIB ConferencesVol. 1(1)
Pennsylvania State University (US)
Openalex Percentile: Top 84%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Opportunities and Challenges for Early Involvement of Trade Partners during the Design Phase of Construction Projects — Lorine A Ouma, Robert Leicht · CIB Conferences (2025) | TGRS Research Map | TGRS