Analysis and Application of Construction Management in The Waled-Ciledug BTS Road Reconstruction Project

Project planning, cost, time, quality, contract administration, and safety management are the regulated aspects of construction in construction management. As a result, project objectives cannot be realized without competent construction management. Planning, execution, and control are the three main functions of construction management. All human and other project resources are managed through these three processes: planning, execution, and review. The purpose of this study aims to determine construction time management, find out how long the project duration will take if using CPM and PERT methods, analyze CPM and PERT on the comparison of planning time. The approach method used is a qualitative technique that involves collecting field data that will be used as information for the research topic. The researcher uses the CPM and PERT methods as a tool in projects related to a management in planning and control in the project. The CPM and PERT methods are used to figure out the duration of the project required and also identify the types of critical work in the project. Based on the analysis conducted, the CPM method only requires 100 days and the PERT method 100.48 days. Using the CPM method produces a time efficiency of up to 20 days compared to the PERT method of only 19.52 days. From the results obtained, the critical path of the two methods is A, B, C, D, and also the non-critical path is E, the duration is faster than the previous plan schedule which is 120 days.

Authors

Institutions

Publication Details

Journal
Jurnal Syntax Transformation
Published
2025-02-28
DOI
https://doi.org/10.46799/jst.v6i2.1065
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis and Application of Construction Management in The Waled-Ciledug BTS Road Reconstruction Project

Herry Hermawan, Radja Syahidir Firdaus
3 links
Jurnal Syntax Transformation
Occupational Health and Safety Management
article

Analysis and Application of Construction Management in The Waled-Ciledug BTS Road Reconstruction Project

Herry Hermawan, Radja Syahidir Firdaus
article en

Abstract

Project planning, cost, time, quality, contract administration, and safety management are the regulated aspects of construction in construction management. As a result, project objectives cannot be realized without competent construction management. Planning, execution, and control are the three main functions of construction management. All human and other project resources are managed through these three processes: planning, execution, and review. The purpose of this study aims to determine construction time management, find out how long the project duration will take if using CPM and PERT methods, analyze CPM and PERT on the comparison of planning time. The approach method used is a qualitative technique that involves collecting field data that will be used as information for the research topic. The researcher uses the CPM and PERT methods as a tool in projects related to a management in planning and control in the project. The CPM and PERT methods are used to figure out the duration of the project required and also identify the types of critical work in the project. Based on the analysis conducted, the CPM method only requires 100 days and the PERT method 100.48 days. Using the CPM method produces a time efficiency of up to 20 days compared to the PERT method of only 19.52 days. From the results obtained, the critical path of the two methods is A, B, C, D, and also the non-critical path is E, the duration is faster than the previous plan schedule which is 120 days.

Jurnal Syntax TransformationVol. 6(2)
Universitas Swadaya Gunung Jati (ID)
Sustainable cities and communities
Openalex Percentile: Top 79%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.