A numerical and intelligent driven method for the drainage arrangement around a deep-buried tunnel in fractured rocks

The rational arrangement of the tunnel drainage system is crucial for the distribution of pore pressure around the tunnel lining, especially for deep-buried tunnels with high groundwater levels. This study proposes a numerical and intelligent driven method for optimization the drainage arrangement around deep-buried tunnels with discrete fracture networks. The hydrodynamic process in drainage holes is characterized by the pipe-flow model, while the fracture network system is described by the non-Darcy flow model. These two systems are combined considering the flow exchange along interfaces. A non-linear hydro-mechanical coupled model for the tunnel system with varied numbers of drainage holes in the fractured rock is then developed and solved in the finite element framework. Benchmark tests are conducted against analytical results and field data collected from a diversion tunnel at the Jinping II Hydropower Station on the Yalong River to demonstrate the reliability of the proposed model. The influence of different parameters related to the arrangement of the drainage system (the penetration depth of drainage holes into the rock, the drainage holes’ number, the spacing property of drainage holes) on the distribution of pore pressure around tunnel linings is investigated. The optimization design for the drainage system of the diversion tunnel of the Jinping II Hydropower Station is further carried out based on an intelligent analysis method using 1,500 sets of numerical results of the seepage distribution obtained from the proposed model. • A non-linear hydro-mechanical coupled model for the tunnel system with embedded drainage holes in the fractured rock is proposed and numerically solved. • The influence of the arrangement of the drainage system on the seepage stability is investigated in a diversion tunnel of the Jinping II Hydropower Station. • An efficient intelligent analysis for optimizing the drainage arrangement is operated based on numerical results.

Authors

Institutions

Publication Details

Journal
Rock Mechanics Bulletin
Published
2025-06-19
DOI
https://doi.org/10.1016/j.rockmb.2025.100218
Citations
2
Primary Topic
Dam Engineering and Safety
Type
article
Field-Weighted Citation Impact
1.91

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A numerical and intelligent driven method for the drainage arrangement around a deep-buried tunnel in fractured rocks

Yun Chen, Guowei Ma, Jingqi Jia, Wei Dong
2 citations
Rock Mechanics Bulletin
Dam Engineering and Safety
1.91
article

A numerical and intelligent driven method for the drainage arrangement around a deep-buried tunnel in fractured rocks

Yun Chen, Guowei Ma, Jingqi Jia, Wei Dong
article en
2 citations

Abstract

The rational arrangement of the tunnel drainage system is crucial for the distribution of pore pressure around the tunnel lining, especially for deep-buried tunnels with high groundwater levels. This study proposes a numerical and intelligent driven method for optimization the drainage arrangement around deep-buried tunnels with discrete fracture networks. The hydrodynamic process in drainage holes is characterized by the pipe-flow model, while the fracture network system is described by the non-Darcy flow model. These two systems are combined considering the flow exchange along interfaces. A non-linear hydro-mechanical coupled model for the tunnel system with varied numbers of drainage holes in the fractured rock is then developed and solved in the finite element framework. Benchmark tests are conducted against analytical results and field data collected from a diversion tunnel at the Jinping II Hydropower Station on the Yalong River to demonstrate the reliability of the proposed model. The influence of different parameters related to the arrangement of the drainage system (the penetration depth of drainage holes into the rock, the drainage holes’ number, the spacing property of drainage holes) on the distribution of pore pressure around tunnel linings is investigated. The optimization design for the drainage system of the diversion tunnel of the Jinping II Hydropower Station is further carried out based on an intelligent analysis method using 1,500 sets of numerical results of the seepage distribution obtained from the proposed model. • A non-linear hydro-mechanical coupled model for the tunnel system with embedded drainage holes in the fractured rock is proposed and numerically solved. • The influence of the arrangement of the drainage system on the seepage stability is investigated in a diversion tunnel of the Jinping II Hydropower Station. • An efficient intelligent analysis for optimizing the drainage arrangement is operated based on numerical results.

Rock Mechanics BulletinVol. 4(4)
Hebei University of Technology (CN), Beijing University of Technology (CN)
National Natural Science Foundation of China, Hebei Province Science and Technology Support Program
Sustainable cities and communities
Openalex Percentile: Top 15%
Dam Engineering and Safety
1.91
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.