USE OF INTEGRATED INTELLIGENCE SCHEDULING SYSTEM (IISS) FOR HEAVY CIVIL CONSTRUCTION PROJECTS

Executing systematic planning requires detailed development for projects involving road construction with bridges and dams coupled with tunnel development since these projects need extended operational spans and numerous integrated tasks. The implementation barrier exists because project execution remains inside unpredictable living environments when using Critical Path Method (CPM) and PERT and bar charts. Project scheduling techniques present challenges in practical implementation because they need better adaptation to moderate changes and provide weak support for project data analysis during ongoing projects thus extending execution periods and creating disjointed working processes between teams. The research examines whether the Integrated Intelligent Scheduling System (IISS) can solve current scheduling system issues. The expert system elements in Integrated Intelligent Scheduling System produce project scheduling solutions through adaptive algorithms and decision support functions that rely on project data. Scientists evaluate the functional elements of the Integrated Intelligent Scheduling System to reduce operational barriers among different groups while optimizing resources through careful analysis of its code structures. The acquired data gets processed into Scheduling systems that match modern needs of heavy civil construction operations.

Authors

Publication Details

Journal
Journal of Emerging Technologies and Innovative Research
Published
2025-01-01
DOI
https://doi.org/10.56975/jetir.v12i5.560867
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

USE OF INTEGRATED INTELLIGENCE SCHEDULING SYSTEM (IISS) FOR HEAVY CIVIL CONSTRUCTION PROJECTS

P. Panchal
Journal of Emerging Technologies and Innovative Research
Construction Project Management and Performance
article

USE OF INTEGRATED INTELLIGENCE SCHEDULING SYSTEM (IISS) FOR HEAVY CIVIL CONSTRUCTION PROJECTS

P. Panchal
article en

Abstract

Executing systematic planning requires detailed development for projects involving road construction with bridges and dams coupled with tunnel development since these projects need extended operational spans and numerous integrated tasks. The implementation barrier exists because project execution remains inside unpredictable living environments when using Critical Path Method (CPM) and PERT and bar charts. Project scheduling techniques present challenges in practical implementation because they need better adaptation to moderate changes and provide weak support for project data analysis during ongoing projects thus extending execution periods and creating disjointed working processes between teams. The research examines whether the Integrated Intelligent Scheduling System (IISS) can solve current scheduling system issues. The expert system elements in Integrated Intelligent Scheduling System produce project scheduling solutions through adaptive algorithms and decision support functions that rely on project data. Scientists evaluate the functional elements of the Integrated Intelligent Scheduling System to reduce operational barriers among different groups while optimizing resources through careful analysis of its code structures. The acquired data gets processed into Scheduling systems that match modern needs of heavy civil construction operations.

Journal of Emerging Technologies and Innovative ResearchVol. 12(5)
Sustainable cities and communities
Openalex Percentile: Top 84%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

USE OF INTEGRATED INTELLIGENCE SCHEDULING SYSTEM (IISS) FOR HEAVY CIVIL CONSTRUCTION PROJECTS — P. Panchal · Journal of Emerging Technologies and Innovative Research (2025) | TGRS Research Map | TGRS