Modeling and Simulation of Hydro Power Plant by Using MATLAB

The demand of electricity increases day by day. The hydropower plant becomes the best source of electricity on the earth. It is produced due to the energy provided by moving or falling water. The cost of electricity remains constant over the year. Because water is a natural source of energy present on the earth. About 71% area of earth is surrounded by the water. So producing electricity with water is the best way to keep environment – ecofriendly. The hydropower plant model was developed using MATLAB/Simulink software. The plant consist of hydro turbine connected to synchronous generator, which is connected to public grid. The dynamic response of the system to the disturbances on the system network was studied. A three phase to ground fault was introduced in the model at 0.2 sec and cleared at 0.4 sec. The simulated result shows that the generated voltage quickly regained its stability on the removal of fault the stator current went into transient after the fault was cleared and become stable at 0.6 sec. The excitation voltage also regain its stability but it was slower and the speed of the rotor was out of stable after the occurrence of the disturbance on the system. The result shows that perfect generation of energy to resist the fault. Key Words —Hydraulic Turbine, Penstock, Governor, Synchronous Generator, System Simulation

Authors

Publication Details

Journal
INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT
Published
2025-06-19
DOI
https://doi.org/10.55041/ijsrem50757
Primary Topic
Wind Turbine Control Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Modeling and Simulation of Hydro Power Plant by Using MATLAB

Harish D Mude
INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENT
Wind Turbine Control Systems
article

Modeling and Simulation of Hydro Power Plant by Using MATLAB

Harish D Mude
article en

Abstract

The demand of electricity increases day by day. The hydropower plant becomes the best source of electricity on the earth. It is produced due to the energy provided by moving or falling water. The cost of electricity remains constant over the year. Because water is a natural source of energy present on the earth. About 71% area of earth is surrounded by the water. So producing electricity with water is the best way to keep environment – ecofriendly. The hydropower plant model was developed using MATLAB/Simulink software. The plant consist of hydro turbine connected to synchronous generator, which is connected to public grid. The dynamic response of the system to the disturbances on the system network was studied. A three phase to ground fault was introduced in the model at 0.2 sec and cleared at 0.4 sec. The simulated result shows that the generated voltage quickly regained its stability on the removal of fault the stator current went into transient after the fault was cleared and become stable at 0.6 sec. The excitation voltage also regain its stability but it was slower and the speed of the rotor was out of stable after the occurrence of the disturbance on the system. The result shows that perfect generation of energy to resist the fault. Key Words —Hydraulic Turbine, Penstock, Governor, Synchronous Generator, System Simulation

INTERANTIONAL JOURNAL OF SCIENTIFIC RESEARCH IN ENGINEERING AND MANAGEMENTVol. 09(06)
Affordable and clean energy
Openalex Percentile: Top 88%
Wind Turbine Control Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.