Multifactory Remanufacturing Process Optimization Considering Worker Scheduling

Multifactory remanufacturing is a widely adopted sustainable manufacturing approach nowadays. Its complexity lies in coordinating the dismantling, remanufacturing, and resource circulation among factories to maximize resource reuse and minimize environmental impact. Proper worker scheduling is crucial in this process to ensure efficient workflow and maximal resource utilization. This study proposes and addresses an optimization problem for multifactory remanufacturing considering worker scheduling, which is mainly divided into two parts: worker scheduling and remanufacturing process optimization (MRPO). A mixed-integer programming (MIP) mathematical model is established with the objective of profit maximization. A discrete battle royale optimization (BRO) algorithm is proposed to solve this problem, with a novel encoding structure and three soldier search strategies devised to better search for the optimal solution. The correctness of the model is validated through experiments on cases of different scales and comparisons with the IBM CPLEX optimizer. Furthermore, comparisons with the carnivorous plant algorithm (CPA), whale optimization algorithm (WAO), dingo optimization algorithm, and migrating bird optimization algorithm demonstrate the superiority and effectiveness of the proposed algorithm.

Authors

Institutions

Publication Details

Journal
IEEE Transactions on Computational Social Systems
Published
2025-06-18
DOI
https://doi.org/10.1109/tcss.2025.3570435
Primary Topic
Sustainable Supply Chain Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multifactory Remanufacturing Process Optimization Considering Worker Scheduling

Liang Qi, Xiwang Guo, Shujin Qin, Qiang Liu et al.
IEEE Transactions on Computational Social Systems
Sustainable Supply Chain Management
article

Multifactory Remanufacturing Process Optimization Considering Worker Scheduling

Liang Qi, Xiwang Guo, Shujin Qin, Qiang Liu, Jiacun Wang, Liangbo Zhou
article en

Abstract

Multifactory remanufacturing is a widely adopted sustainable manufacturing approach nowadays. Its complexity lies in coordinating the dismantling, remanufacturing, and resource circulation among factories to maximize resource reuse and minimize environmental impact. Proper worker scheduling is crucial in this process to ensure efficient workflow and maximal resource utilization. This study proposes and addresses an optimization problem for multifactory remanufacturing considering worker scheduling, which is mainly divided into two parts: worker scheduling and remanufacturing process optimization (MRPO). A mixed-integer programming (MIP) mathematical model is established with the objective of profit maximization. A discrete battle royale optimization (BRO) algorithm is proposed to solve this problem, with a novel encoding structure and three soldier search strategies devised to better search for the optimal solution. The correctness of the model is validated through experiments on cases of different scales and comparisons with the IBM CPLEX optimizer. Furthermore, comparisons with the carnivorous plant algorithm (CPA), whale optimization algorithm (WAO), dingo optimization algorithm, and migrating bird optimization algorithm demonstrate the superiority and effectiveness of the proposed algorithm.

IEEE Transactions on Computational Social SystemsVol. 12(5)
Monmouth University (US), Liaoning Shihua University (CN), Shandong University of Science and Technology (CN), Shangqiu Normal University (CN)
Decent work and economic growth
Openalex Percentile: Top 79%
Sustainable Supply Chain Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.