Session 25. Oral Presentation for: A decade of the Karratha Gas Plant life extension program

Presented on 29 May 2025: Session 25 The Karratha Life Extension (KLE) Project is a comprehensive, multi-billion-dollar program initiated in 2013 to extend the life of the Karratha Gas Plant (KGP) asset, managing integrity and reliability risks of ageing facilities reaching the end of design life. The scale of the program represents a significant investment in the North West Shelf (NWS) Project by Woodside and the NWS Joint Venture Participants to underpin the ongoing safe and reliable production of the NWS fields and third-party gas processing, which commenced commercial operations in 2022. Encompassing over 400 projects, the program has involved upgrading, replacing and refurbishing existing infrastructure and equipment. To access the Oral Presentation click the link below. To read the full paper click here

Authors

Institutions

Publication Details

Journal
Australian Energy Producers journal.
Published
2025-06-18
DOI
https://doi.org/10.1071/ep24406
Primary Topic
Offshore Engineering and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Session 25. Oral Presentation for: A decade of the Karratha Gas Plant life extension program

Jude Page
Australian Energy Producers journal.
Offshore Engineering and Technologies
article

Session 25. Oral Presentation for: A decade of the Karratha Gas Plant life extension program

Jude Page
article en

Abstract

Presented on 29 May 2025: Session 25 The Karratha Life Extension (KLE) Project is a comprehensive, multi-billion-dollar program initiated in 2013 to extend the life of the Karratha Gas Plant (KGP) asset, managing integrity and reliability risks of ageing facilities reaching the end of design life. The scale of the program represents a significant investment in the North West Shelf (NWS) Project by Woodside and the NWS Joint Venture Participants to underpin the ongoing safe and reliable production of the NWS fields and third-party gas processing, which commenced commercial operations in 2022. Encompassing over 400 projects, the program has involved upgrading, replacing and refurbishing existing infrastructure and equipment. To access the Oral Presentation click the link below. To read the full paper click here

Australian Energy Producers journal.Vol. 65(4)
Woodside (Australia) (AU)
Industry, innovation and infrastructure
Openalex Percentile: Top 83%
Offshore Engineering and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.