Session 25. Oral Presentation for: Minimising green hydrogen capital expenditure: lessons learned from Europe

Presented on 29 May 2025: Session 25 European policy initiatives and impacts of the war in Ukraine have driven large green hydrogen projects in Europe at a faster pace than in Australia. Several of these, at capacities over 100 MW, have now taken a final investment decision (FID) with detailed engineering and construction underway. This paper discusses learnings from the development and progression of these projects through FID and into construction and how this translates to Australian projects progressing through FID at scale. There are many factors including policy and incentives, offtake certainty and pricing, cost and availability of power, water and land, that influence the progression of projects through FID. Once these have been navigated a further hurdle to overcome is the magnitude of the project’s capital expenditure (CAPEX) and the speed at which this capital can be converted into an operating asset. Green hydrogen production, when coupled with a downstream derivative, includes facilities which span multiple industry sectors including water treatment, industrial gases and high hazard process facilities. Proponents proposing to develop green hydrogen projects range from start-ups to multinational integrated energy companies bringing varied approaches to project development and engineering and differing levels of understanding of the key CAPEX levers. Insights into these levers and how the mix of industry sectors and proponents influence the plans, expectations and ultimately the costs are discussed including: (1) Economies of scale and technology development. (2) Brownfield developments and leveraging existing or common user infrastructure. (3) The project delivery and engineering model to achieve a minimum viable product. To access the Oral Presentation click the link below. To read the full paper click here

Authors

Institutions

Publication Details

Journal
Australian Energy Producers journal.
Published
2025-06-18
DOI
https://doi.org/10.1071/ep24453
Primary Topic
Global Energy Security and Policy
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Session 25. Oral Presentation for: Minimising green hydrogen capital expenditure: lessons learned from Europe

Andrew Garton
Australian Energy Producers journal.
Global Energy Security and Policy
article

Session 25. Oral Presentation for: Minimising green hydrogen capital expenditure: lessons learned from Europe

Andrew Garton
article en

Abstract

Presented on 29 May 2025: Session 25 European policy initiatives and impacts of the war in Ukraine have driven large green hydrogen projects in Europe at a faster pace than in Australia. Several of these, at capacities over 100 MW, have now taken a final investment decision (FID) with detailed engineering and construction underway. This paper discusses learnings from the development and progression of these projects through FID and into construction and how this translates to Australian projects progressing through FID at scale. There are many factors including policy and incentives, offtake certainty and pricing, cost and availability of power, water and land, that influence the progression of projects through FID. Once these have been navigated a further hurdle to overcome is the magnitude of the project’s capital expenditure (CAPEX) and the speed at which this capital can be converted into an operating asset. Green hydrogen production, when coupled with a downstream derivative, includes facilities which span multiple industry sectors including water treatment, industrial gases and high hazard process facilities. Proponents proposing to develop green hydrogen projects range from start-ups to multinational integrated energy companies bringing varied approaches to project development and engineering and differing levels of understanding of the key CAPEX levers. Insights into these levers and how the mix of industry sectors and proponents influence the plans, expectations and ultimately the costs are discussed including: (1) Economies of scale and technology development. (2) Brownfield developments and leveraging existing or common user infrastructure. (3) The project delivery and engineering model to achieve a minimum viable product. To access the Oral Presentation click the link below. To read the full paper click here

Australian Energy Producers journal.Vol. 65(4)
Wesley Research Institute (AU)
Industry, innovation and infrastructure
Openalex Percentile: Top 81%
Global Energy Security and Policy
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Session 25. Oral Presentation for: Minimising green hydrogen capital expenditure: lessons learned from Europe — Andrew Garton · Australian Energy Producers journal. (2025) | TGRS Research Map | TGRS