Engineering Visual Presentation E07: A case study on CO2 production casing operations

Engineering Visual Presentation E07 This paper presents a case study on the innovative deployment of a production casing run, incorporating dual fibre optic (FO) cables on the exterior of the casing, secured with specialised clamps and centralisers, and protected with blast rods for future perforating. The integration of these cables required not only operational adjustments involving spoolers and sheaves but also a bespoke cement blend to ensure compatibility with the unique casing configuration. The cement formulation was specifically tailored for corrosion resistance as the well is expected to be exposed to carbon dioxide during a future injection. This was achieved using local additives that were both emissions-friendly and offered comparable performance to premium alternatives. Additionally, the use of premium threads required the use of a casing running tool, which proved to be an optimal choice over conventional casing tongs. This configuration minimised the operational footprint on the drill floor, reduced handling risks and streamlined operations, particularly given the added complexity of personnel and equipment managing the FO cables and clamps during the casing make up and running operations. The study underscores the value of tailored engineering solutions in complex well construction scenarios and highlights the effectiveness of specific tools and materials in optimising safety, performance and environmental impact. These insights are intended to advance the understanding of best practices in the industry for casing runs that involve complex cable integration and corrosion-resistant cement blends. To access the Visual Presentation click the link below. To read the full paper click here

Authors

Institutions

Publication Details

Journal
Australian Energy Producers journal.
Published
2025-06-18
DOI
https://doi.org/10.1071/ep24400
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Engineering Visual Presentation E07: A case study on CO2 production casing operations

Jessica Wrigley
Australian Energy Producers journal.
Drilling and Well Engineering
article

Engineering Visual Presentation E07: A case study on CO2 production casing operations

Jessica Wrigley
article en

Abstract

Engineering Visual Presentation E07 This paper presents a case study on the innovative deployment of a production casing run, incorporating dual fibre optic (FO) cables on the exterior of the casing, secured with specialised clamps and centralisers, and protected with blast rods for future perforating. The integration of these cables required not only operational adjustments involving spoolers and sheaves but also a bespoke cement blend to ensure compatibility with the unique casing configuration. The cement formulation was specifically tailored for corrosion resistance as the well is expected to be exposed to carbon dioxide during a future injection. This was achieved using local additives that were both emissions-friendly and offered comparable performance to premium alternatives. Additionally, the use of premium threads required the use of a casing running tool, which proved to be an optimal choice over conventional casing tongs. This configuration minimised the operational footprint on the drill floor, reduced handling risks and streamlined operations, particularly given the added complexity of personnel and equipment managing the FO cables and clamps during the casing make up and running operations. The study underscores the value of tailored engineering solutions in complex well construction scenarios and highlights the effectiveness of specific tools and materials in optimising safety, performance and environmental impact. These insights are intended to advance the understanding of best practices in the industry for casing runs that involve complex cable integration and corrosion-resistant cement blends. To access the Visual Presentation click the link below. To read the full paper click here

Australian Energy Producers journal.Vol. 65(4)
Ergon Energy (Australia) (AU)
Openalex Percentile: Top 83%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Engineering Visual Presentation E07: A case study on CO2 production casing operations — Jessica Wrigley · Australian Energy Producers journal. (2025) | TGRS Research Map | TGRS