Session 5. Oral Presentation for: Findings from the Northern Territory Low Emissions Hub CCUS business case project

Presented on 27 May 2025: Session 5 CSIRO has led a consortium in the delivery of a carbon capture utilisation and storage (CCUS) business case project. The project has assessed the requirements for a CCUS hub located in the vicinity of the Middle Arm, Darwin, Northern Territory. The particular emphasis of this project has been to understand how a CCUS hub development could link to wider decarbonisation activities and future industrial development. The outcomes from the project are broken into three parts. (1) Northern Territory and regional understanding of macro-economic drivers, emissions, product markets and best practice hub examples. (2) CCUS hub technical definition and technical risk reduction studies including a power systems optimisation study, identification of sector coupling opportunities, a CO2 shipping study and a Northern Territory CO2 utilisation roadmap. (3) Mapping the policy and regulatory environment, understanding the economic impacts of the CCUS hub development and suggested execution plans. To access the Oral Presentation click the link below. To read the full paper click here

Authors

Institutions

Publication Details

Journal
Australian Energy Producers journal.
Published
2025-06-18
DOI
https://doi.org/10.1071/ep24524
Primary Topic
Offshore Engineering and Technologies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Session 5. Oral Presentation for: Findings from the Northern Territory Low Emissions Hub CCUS business case project

Andrew S. Ross
Australian Energy Producers journal.
Offshore Engineering and Technologies
article

Session 5. Oral Presentation for: Findings from the Northern Territory Low Emissions Hub CCUS business case project

Andrew S. Ross
article en

Abstract

Presented on 27 May 2025: Session 5 CSIRO has led a consortium in the delivery of a carbon capture utilisation and storage (CCUS) business case project. The project has assessed the requirements for a CCUS hub located in the vicinity of the Middle Arm, Darwin, Northern Territory. The particular emphasis of this project has been to understand how a CCUS hub development could link to wider decarbonisation activities and future industrial development. The outcomes from the project are broken into three parts. (1) Northern Territory and regional understanding of macro-economic drivers, emissions, product markets and best practice hub examples. (2) CCUS hub technical definition and technical risk reduction studies including a power systems optimisation study, identification of sector coupling opportunities, a CO2 shipping study and a Northern Territory CO2 utilisation roadmap. (3) Mapping the policy and regulatory environment, understanding the economic impacts of the CCUS hub development and suggested execution plans. To access the Oral Presentation click the link below. To read the full paper click here

Australian Energy Producers journal.Vol. 65(4)
Australian Resources Research Centre (AU)
Industry, innovation and infrastructure
Openalex Percentile: Top 83%
Offshore Engineering and Technologies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Session 5. Oral Presentation for: Findings from the Northern Territory Low Emissions Hub CCUS business case project — Andrew S. Ross · Australian Energy Producers journal. (2025) | TGRS Research Map | TGRS