Session 12. Oral Presentation for: Primary cementing practices and compliance in Queensland’s petroleum wells

Presented on 28 May 2025: Session 12 Primary cementing is a crucial aspect of petroleum well construction, ensuring long-term well integrity, preventing fluid migration, and protecting groundwater. In Queensland, Resources Safety & Health Queensland (RSHQ) Petroleum and Gas Inspectorate enforces the Code of Practice for the construction and abandonment of petroleum wells and associated bores in Queensland, which outlines engineering and technical requirements for well construction and abandonment. Between January 2020 and December 2023, industry operators drilled 2541 wells and reported 43 failures to meet primary cementing objectives (FTMCOs), prompting the Inspectorate to conduct industry-wide audits. The audits focussed on compliance with cementing practices, formal safety assessments, slurry design, laboratory testing, verification procedures, and factors contributing to slumping and failure to reach the designed top of cement (TOC). Key findings highlighted gaps in formal safety assessments, a tendency to delegate cement slurry design to contractors without rigorous technical oversight, and inconsistencies in laboratory testing documentation. Additionally, verification procedures were not always aligned with regulatory requirements, and cement losses presented significant challenges towards the slumping and TOC deficiencies. To enhance primary cementing practices, the paper recommends strengthening oversight of cementing contractors’ technical capabilities, improving verification procedures, and ensuring consistent comprehensive risk assessments. Aligning cement verification procedures with regulatory requirements and adopting best practices for mitigating cement losses will improve well integrity and regulatory compliance. To access the Oral Presentation click the link below. To read the full paper click here

Authors

Institutions

Publication Details

Journal
Australian Energy Producers journal.
Published
2025-06-18
DOI
https://doi.org/10.1071/ep24528
Primary Topic
Drilling and Well Engineering
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Session 12. Oral Presentation for: Primary cementing practices and compliance in Queensland’s petroleum wells

Ahmed Harfoush
Australian Energy Producers journal.
Drilling and Well Engineering
article

Session 12. Oral Presentation for: Primary cementing practices and compliance in Queensland’s petroleum wells

Ahmed Harfoush
article en

Abstract

Presented on 28 May 2025: Session 12 Primary cementing is a crucial aspect of petroleum well construction, ensuring long-term well integrity, preventing fluid migration, and protecting groundwater. In Queensland, Resources Safety & Health Queensland (RSHQ) Petroleum and Gas Inspectorate enforces the Code of Practice for the construction and abandonment of petroleum wells and associated bores in Queensland, which outlines engineering and technical requirements for well construction and abandonment. Between January 2020 and December 2023, industry operators drilled 2541 wells and reported 43 failures to meet primary cementing objectives (FTMCOs), prompting the Inspectorate to conduct industry-wide audits. The audits focussed on compliance with cementing practices, formal safety assessments, slurry design, laboratory testing, verification procedures, and factors contributing to slumping and failure to reach the designed top of cement (TOC). Key findings highlighted gaps in formal safety assessments, a tendency to delegate cement slurry design to contractors without rigorous technical oversight, and inconsistencies in laboratory testing documentation. Additionally, verification procedures were not always aligned with regulatory requirements, and cement losses presented significant challenges towards the slumping and TOC deficiencies. To enhance primary cementing practices, the paper recommends strengthening oversight of cementing contractors’ technical capabilities, improving verification procedures, and ensuring consistent comprehensive risk assessments. Aligning cement verification procedures with regulatory requirements and adopting best practices for mitigating cement losses will improve well integrity and regulatory compliance. To access the Oral Presentation click the link below. To read the full paper click here

Australian Energy Producers journal.Vol. 65(4)
Queensland Health (AU)
Partnerships for the goals, Industry, innovation and infrastructure
Openalex Percentile: Top 83%
Drilling and Well Engineering
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.