Session 25. Oral Presentation for: Multi-disciplined/collaborative team approach to deliver Kipper Compression Project

Presented on 29 May 2025: Session 25 The Kipper gas field in Australia’s offshore Gippsland Basin was initially developed from two subsea wells producing back to the West Tuna host platform commencing in 2017. The Kipper field is unique in the Gippsland Basin as it is a Golden Beach Formation pressure depletion-drive reservoir, requiring compression to support recovery of the produceable reserves. As such, the Kipper Compression Project, which was successfully installed in 2024, represents another significant infrastructure investment in the Bass Strait where 100% of gas from the basin is sold into Australia’s east coast domestic market. This project represented a multi-year effort with a high degree of brownfield complexity to install the compression components on a producing platform. The project leveraged a modularised design inclusive of the gas compressor and turbine package, fuel gas and seal gas conditioning equipment, as well as condensate pumping, power and controls infrastructure. The tie-in and integration scope on West Tuna involved significant interfacing and risk management between the project, logistics and operations teams. Successful project delivery necessitated a multi-disciplined and collaborative team effort from early concept selection and facility design, and a highly coordinated effort through module fabrication, transportation, shorebase load-out, offshore installation, hook-up and commissioning. West Tuna platform and Kipper Compression facilities are within Gippsland Basin Joint Venture (GBJV) operated by Esso Australia Resources Pty Ltd (50%) and partners with Woodside Energy (50%). This paper also has a Visual Presentation available. To access the Visual Presentation click the link below. To read the full paper click here

Authors

Institutions

Publication Details

Journal
Australian Energy Producers journal.
Published
2025-06-18
DOI
https://doi.org/10.1071/ep24525
Primary Topic
Oil and Gas Production Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Session 25. Oral Presentation for: Multi-disciplined/collaborative team approach to deliver Kipper Compression Project

D. H. Fuller
Australian Energy Producers journal.
Oil and Gas Production Techniques
article

Session 25. Oral Presentation for: Multi-disciplined/collaborative team approach to deliver Kipper Compression Project

D. H. Fuller
article en

Abstract

Presented on 29 May 2025: Session 25 The Kipper gas field in Australia’s offshore Gippsland Basin was initially developed from two subsea wells producing back to the West Tuna host platform commencing in 2017. The Kipper field is unique in the Gippsland Basin as it is a Golden Beach Formation pressure depletion-drive reservoir, requiring compression to support recovery of the produceable reserves. As such, the Kipper Compression Project, which was successfully installed in 2024, represents another significant infrastructure investment in the Bass Strait where 100% of gas from the basin is sold into Australia’s east coast domestic market. This project represented a multi-year effort with a high degree of brownfield complexity to install the compression components on a producing platform. The project leveraged a modularised design inclusive of the gas compressor and turbine package, fuel gas and seal gas conditioning equipment, as well as condensate pumping, power and controls infrastructure. The tie-in and integration scope on West Tuna involved significant interfacing and risk management between the project, logistics and operations teams. Successful project delivery necessitated a multi-disciplined and collaborative team effort from early concept selection and facility design, and a highly coordinated effort through module fabrication, transportation, shorebase load-out, offshore installation, hook-up and commissioning. West Tuna platform and Kipper Compression facilities are within Gippsland Basin Joint Venture (GBJV) operated by Esso Australia Resources Pty Ltd (50%) and partners with Woodside Energy (50%). This paper also has a Visual Presentation available. To access the Visual Presentation click the link below. To read the full paper click here

Australian Energy Producers journal.Vol. 65(4)
IDEXX Laboratories (France) (FR)
Industry, innovation and infrastructure
Openalex Percentile: Top 83%
Oil and Gas Production Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.