Session 2. Oral Presentation for: Maximising deliverability of the Kipper Field to ensure reliable supply of gas into the east coast Australia market

Presented on 27 May 2025: Session 2 The Kipper gas field in Australia’s offshore Gippsland Basin has been in production since 2017 with two subsea wells in the initial development phase. With legacy fields from Bass Strait depleting, the Kipper Field plays an increasingly important role in the Gippsland Basin supply mix, where 100% of gas from the basin is sold into Australia’s east coast domestic market. The Kipper Unit Joint Venture (KUJV) partners are actively investing in field developments to responsibly manage the field and to secure reliable gas production into the next decade. The Kipper Field is unique as it is a Golden Beach Formation pressure depletion-drive reservoir. As such, the Kipper Compression Project, which was installed in 2024, will deliver the required infrastructure critical to maintaining plateau rates from the existing two production wells. Additionally, the KUJV partners have commenced planning a subsea infill well which, subject to final investment decision and regulatory approvals, is expected to come online in 2026, to accelerate and capture additional gas reserves. This effort has been underpinned by a collaborative multi-disciplinary approach which utilises new subsurface datasets, including 3D seismic acquired in 2020, to optimise this next phase of development. The Kipper Field is operated by Esso Australia Resources Pty Ltd (32.5%), with partners Woodside Energy (Bass Strait) Pty Ltd (32.5%) and Mitsui E&P Australia Pty Ltd (35%). To access the Oral Presentation click the link below. To read the full paper click here

Authors

Institutions

Publication Details

Journal
Australian Energy Producers journal.
Published
2025-06-18
DOI
https://doi.org/10.1071/ep24499
Primary Topic
Reservoir Engineering and Simulation Methods
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Session 2. Oral Presentation for: Maximising deliverability of the Kipper Field to ensure reliable supply of gas into the east coast Australia market

Steven J. Spencer
Australian Energy Producers journal.
Reservoir Engineering and Simulation Methods
article

Session 2. Oral Presentation for: Maximising deliverability of the Kipper Field to ensure reliable supply of gas into the east coast Australia market

Steven J. Spencer
article en

Abstract

Presented on 27 May 2025: Session 2 The Kipper gas field in Australia’s offshore Gippsland Basin has been in production since 2017 with two subsea wells in the initial development phase. With legacy fields from Bass Strait depleting, the Kipper Field plays an increasingly important role in the Gippsland Basin supply mix, where 100% of gas from the basin is sold into Australia’s east coast domestic market. The Kipper Unit Joint Venture (KUJV) partners are actively investing in field developments to responsibly manage the field and to secure reliable gas production into the next decade. The Kipper Field is unique as it is a Golden Beach Formation pressure depletion-drive reservoir. As such, the Kipper Compression Project, which was installed in 2024, will deliver the required infrastructure critical to maintaining plateau rates from the existing two production wells. Additionally, the KUJV partners have commenced planning a subsea infill well which, subject to final investment decision and regulatory approvals, is expected to come online in 2026, to accelerate and capture additional gas reserves. This effort has been underpinned by a collaborative multi-disciplinary approach which utilises new subsurface datasets, including 3D seismic acquired in 2020, to optimise this next phase of development. The Kipper Field is operated by Esso Australia Resources Pty Ltd (32.5%), with partners Woodside Energy (Bass Strait) Pty Ltd (32.5%) and Mitsui E&P Australia Pty Ltd (35%). To access the Oral Presentation click the link below. To read the full paper click here

Australian Energy Producers journal.Vol. 65(4)
Victorian Curriculum and Assessment Authority (AU)
Industry, innovation and infrastructure
Openalex Percentile: Top 83%
Reservoir Engineering and Simulation Methods
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Session 2. Oral Presentation for: Maximising deliverability of the Kipper Field to ensure reliable supply of gas into the east coast Australia market — Steven J. Spencer · Australian Energy Producers journal. (2025) | TGRS Research Map | TGRS