Research on interconnected operation characteristics of combined cooling heating and power system based on load difference

The two combined cooling, heating, and power (CCHP) systems in the region can be connected through the power and heat grids to realize interconnected operation, taking advantage of the spatial and temporal complementarity of load demand and significantly improving the overall performance of the regional energy system. In this paper, a mathematical model of the interconnected combined cooling, heating, and power (ICCHP) system is first constructed, and three operation strategies, namely following electric load (FEL), following thermal load (FTL), and following hybrid electric-heating load (FHL), are considered. The combined performance index (CPI) of the two CCHP systems under interconnected and independent operation is calculated based on the conventional split-supply (SP) system by combining the strategies. Subsequently, a load characterization parameter (the time interval at which the load is shifted along the time axis) is proposed to further investigate the effect of load difference on the performance of the ICCHP system. The results indicate that the system performance of CCHP systems with different building users in the interconnected mode of operation is improved compared to the independent mode of operation, which is mainly due to the energy complementary characteristics between different load demands and operation strategies. In particular, when both CCHP systems are operated with the FTL strategy, the CPI of the systems in the three interconnection scenarios improves the most compared to when they are operated independently, which are 9.14 %, 9.37 %, and 5.02 %, respectively. Overall, when CCHP systems for two different building users operate interconnected, the reduction in the difference in load peak and valley durations results in a reduction in ICCHP system performance.

Authors

Publication Details

Journal
Case Studies in Thermal Engineering
Published
2025-06-18
DOI
https://doi.org/10.1016/j.csite.2025.106509
Primary Topic
Integrated Energy Systems Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on interconnected operation characteristics of combined cooling heating and power system based on load difference

Bin Peng, Yaohong Li, Xiaoyang Bian, Haolong Wang et al.
Case Studies in Thermal Engineering
Integrated Energy Systems Optimization
article

Research on interconnected operation characteristics of combined cooling heating and power system based on load difference

Bin Peng, Yaohong Li, Xiaoyang Bian, Haolong Wang, Pengxiang Wang
article en

Abstract

The two combined cooling, heating, and power (CCHP) systems in the region can be connected through the power and heat grids to realize interconnected operation, taking advantage of the spatial and temporal complementarity of load demand and significantly improving the overall performance of the regional energy system. In this paper, a mathematical model of the interconnected combined cooling, heating, and power (ICCHP) system is first constructed, and three operation strategies, namely following electric load (FEL), following thermal load (FTL), and following hybrid electric-heating load (FHL), are considered. The combined performance index (CPI) of the two CCHP systems under interconnected and independent operation is calculated based on the conventional split-supply (SP) system by combining the strategies. Subsequently, a load characterization parameter (the time interval at which the load is shifted along the time axis) is proposed to further investigate the effect of load difference on the performance of the ICCHP system. The results indicate that the system performance of CCHP systems with different building users in the interconnected mode of operation is improved compared to the independent mode of operation, which is mainly due to the energy complementary characteristics between different load demands and operation strategies. In particular, when both CCHP systems are operated with the FTL strategy, the CPI of the systems in the three interconnection scenarios improves the most compared to when they are operated independently, which are 9.14 %, 9.37 %, and 5.02 %, respectively. Overall, when CCHP systems for two different building users operate interconnected, the reduction in the difference in load peak and valley durations results in a reduction in ICCHP system performance.

Case Studies in Thermal EngineeringVol. 73
Affordable and clean energy
Openalex Percentile: Top 88%
Integrated Energy Systems Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.