An analytics-based framework for optimizing resource allocation and preemptive scheduling in manufacturing

Production scheduling is critical in manufacturing operations, requiring the optimal assignment of limited resources. This paper introduces a novel generalization of the Unrelated Parallel Machine (UPM) problem, addressing key real-world complexities: sequence- and machine-dependent setup times, resource assignment constraints, and preemptive scheduling. These extensions, particularly workforce assignments where specific qualifications and availability schedules determine employee eligibility, represent a significant step forward in industrial scheduling research. A Mixed Integer Linear Programming (MILP) model and three constraint-specific variations were developed to evaluate performance and scalability and isolate preemption and resource constraints. Extensive computational experiments demonstrated a trade-off between model applicability and computational efficiency. The proposed model achieved realistic job distribution across machines but encountered scalability challenges due to the combinatorial complexity introduced by what we term dense eligibility matrices, representing a high proportion of potential employee-machine assignments. The preemption-only model optimized makespan effectively, while the resource-focused model provided more practical solutions at the cost of higher processing times. The baseline UPM with sequence-dependent setup times (UPMS) model exhibited computational efficiency but lacked applicability to dynamic industrial environments. This study highlights the impact of preemption and resource assignment on scheduling optimization and underscores the importance of sparsity reduction techniques to enhance scalability. By bridging gaps in workforce management and operational flexibility, the proposed framework provides a robust foundation for addressing complex industrial scheduling challenges. • Propose a decision analytics model for resource-constrained and preemptive scheduling in manufacturing systems. • Formulate a robust mathematical model integrating setup times, workforce constraints, and machine eligibility. • Evaluate model variations to understand the trade-off between computational efficiency and real-world realism. • Analyse the impact of preemptive scheduling and skill-based assignment on production makespan. • Highlight opportunities for hybrid and heuristic approaches to enhance scalability in complex scheduling environments.

Authors

Institutions

Publication Details

Journal
Decision Analytics Journal
Published
2025-06-18
DOI
https://doi.org/10.1016/j.dajour.2025.100596
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

An analytics-based framework for optimizing resource allocation and preemptive scheduling in manufacturing

Alejandro Uribe, Iñigo Martı́nez, Igor G. Olaizola, Arkaitz Artetxe et al.
Decision Analytics Journal
Scheduling and Optimization Algorithms
article

An analytics-based framework for optimizing resource allocation and preemptive scheduling in manufacturing

Alejandro Uribe, Iñigo Martı́nez, Igor G. Olaizola, Arkaitz Artetxe, Urtzi Otamendi, Basilio Sierra, Javier Sedano Franco, Xabier Belaunzaran
article en

Abstract

Production scheduling is critical in manufacturing operations, requiring the optimal assignment of limited resources. This paper introduces a novel generalization of the Unrelated Parallel Machine (UPM) problem, addressing key real-world complexities: sequence- and machine-dependent setup times, resource assignment constraints, and preemptive scheduling. These extensions, particularly workforce assignments where specific qualifications and availability schedules determine employee eligibility, represent a significant step forward in industrial scheduling research. A Mixed Integer Linear Programming (MILP) model and three constraint-specific variations were developed to evaluate performance and scalability and isolate preemption and resource constraints. Extensive computational experiments demonstrated a trade-off between model applicability and computational efficiency. The proposed model achieved realistic job distribution across machines but encountered scalability challenges due to the combinatorial complexity introduced by what we term dense eligibility matrices, representing a high proportion of potential employee-machine assignments. The preemption-only model optimized makespan effectively, while the resource-focused model provided more practical solutions at the cost of higher processing times. The baseline UPM with sequence-dependent setup times (UPMS) model exhibited computational efficiency but lacked applicability to dynamic industrial environments. This study highlights the impact of preemption and resource assignment on scheduling optimization and underscores the importance of sparsity reduction techniques to enhance scalability. By bridging gaps in workforce management and operational flexibility, the proposed framework provides a robust foundation for addressing complex industrial scheduling challenges. • Propose a decision analytics model for resource-constrained and preemptive scheduling in manufacturing systems. • Formulate a robust mathematical model integrating setup times, workforce constraints, and machine eligibility. • Evaluate model variations to understand the trade-off between computational efficiency and real-world realism. • Analyse the impact of preemptive scheduling and skill-based assignment on production makespan. • Highlight opportunities for hybrid and heuristic approaches to enhance scalability in complex scheduling environments.

Decision Analytics JournalVol. 16
University of the Basque Country (ES), Centro de Estudios e Investigaciones Técnicas de Gipuzkoa (ES), Vicomtech (ES), Universidad EAFIT (CO)
Ministerio de Industria, Energía y Turismo
Openalex Percentile: Top 80%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.