Kajian Potensi Implementasi Building Information Modeling (Bim) Terintegrasi Pada Proses Penanganan Contract Change Order (Cco) Dalam Proyek Konstruksi Gedung

A Contract Change Order (CCO) is a formal mechanism that accommodates changes in construction implementation, which commonly occur in projects. Although it provides flexibility and adaptability, the CCO process often requires complex coordination and takes considerable time. Therefore, effective management is essential to minimize negative impacts on stakeholders. Implementing integrated Building Information Modeling (BIM) based on a Common Data Environment (CDE) is a digital innovation that may potentially improve the effectiveness of the CCO process. In Indonesia, the use of BIM is increasingly encouraged through the Regulation of the Minister of Public Works and Housing (PUPR) of the Republic of Indonesia Number 22 of 2018, particularly for non-simple state buildings. This study examines the implementation of integrated BIM-based CCO handling in one of the pilot building projects. The methods include a literature review, contract document analysis, interviews, and project data collection. The study found that the reviewed project had implemented CCO handling using three approaches: conventional methods, integrated BIM, and a combination of both. To assess the implementation, a comparison was made between the planned integrated BIM-based CCO process and actual conditions in the field. The analysis revealed that although the integrated BIM approach had been adopted, its implementation still faces several challenges. The main issues identified include the limited number of CDE user accounts, low human resource capacity, delays in 3D BIM modeling, and unclear legal frameworks governing the use of BIM in contract change processes.

Authors

Institutions

Publication Details

Journal
Syntax Literate Jurnal Ilmiah Indonesia
Published
2025-06-17
DOI
https://doi.org/10.36418/syntax-literate.v10i6.59701
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Kajian Potensi Implementasi Building Information Modeling (Bim) Terintegrasi Pada Proses Penanganan Contract Change Order (Cco) Dalam Proyek Konstruksi Gedung

Fauzi Septama Sis, Fatika Lista Sabrisavira, Rahila Sabila Ma’wa, Meisya Paramita Nurhaliza et al.
Syntax Literate Jurnal Ilmiah Indonesia
BIM and Construction Integration
article

Kajian Potensi Implementasi Building Information Modeling (Bim) Terintegrasi Pada Proses Penanganan Contract Change Order (Cco) Dalam Proyek Konstruksi Gedung

Fauzi Septama Sis, Fatika Lista Sabrisavira, Rahila Sabila Ma’wa, Meisya Paramita Nurhaliza, Bariq Akmal
article en

Abstract

A Contract Change Order (CCO) is a formal mechanism that accommodates changes in construction implementation, which commonly occur in projects. Although it provides flexibility and adaptability, the CCO process often requires complex coordination and takes considerable time. Therefore, effective management is essential to minimize negative impacts on stakeholders. Implementing integrated Building Information Modeling (BIM) based on a Common Data Environment (CDE) is a digital innovation that may potentially improve the effectiveness of the CCO process. In Indonesia, the use of BIM is increasingly encouraged through the Regulation of the Minister of Public Works and Housing (PUPR) of the Republic of Indonesia Number 22 of 2018, particularly for non-simple state buildings. This study examines the implementation of integrated BIM-based CCO handling in one of the pilot building projects. The methods include a literature review, contract document analysis, interviews, and project data collection. The study found that the reviewed project had implemented CCO handling using three approaches: conventional methods, integrated BIM, and a combination of both. To assess the implementation, a comparison was made between the planned integrated BIM-based CCO process and actual conditions in the field. The analysis revealed that although the integrated BIM approach had been adopted, its implementation still faces several challenges. The main issues identified include the limited number of CDE user accounts, low human resource capacity, delays in 3D BIM modeling, and unclear legal frameworks governing the use of BIM in contract change processes.

Syntax Literate Jurnal Ilmiah IndonesiaVol. 10(6)
Bandung Institute of Technology (ID)
Industry, innovation and infrastructure
Openalex Percentile: Top 86%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Kajian Potensi Implementasi Building Information Modeling (Bim) Terintegrasi Pada Proses Penanganan Contract Change Order (Cco) Dalam Proyek Konstruksi Gedung — Fauzi Septama Sis, Fatika Lista Sabrisavira, et al. · Syntax Literate Jurnal Ilmiah Indonesia (2025) | TGRS Research Map | TGRS