Methodology for Implementing Monitoring Data into Probabilistic Analysis of Existing Embankment Dams

Monitoring data provide valuable information on embankment dam behavior but are typically not integrated into a classical probabilistic safety assessment. This paper introduces a Bayesian-inspired methodology to directly integrate actual dam monitoring records into a Monte Carlo probabilistic safety assessment using a finite element framework, without recalibrating the original input parameters ‘distributions. After the baseline (unweighted) set of simulations is generated, the method assigns a weight coefficient to each simulation outcome based on the likelihood of matching monitoring data, effectively updating the baseline probabilistic analysis results. Therefore, such “weighted” analysis produces an updated probability distribution of the dam’s factor of safety (FS) that reflects both prior uncertainty of model parameters and actual monitoring data. To illustrate the approach, a case study of a rockfill triaxial test specimen is analyzed: a baseline probabilistic analysis yields a mean FS ~1.7, whereas the weighted analysis incorporating monitoring data reduces the mean FS to ~1.5 and narrows the variability. The weighted analysis suggests less favorable conditions than the baseline projections. This methodology offers a transparent, computationally tractable route for embedding monitoring evidence into reliability calculations, producing more reflective safety estimates of actual dam behavior.

Authors

Institutions

Publication Details

Journal
Applied Sciences
Published
2025-06-17
DOI
https://doi.org/10.3390/app15126786
Citations
1
Primary Topic
Dam Engineering and Safety
Type
article
Field-Weighted Citation Impact
0.95
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Methodology for Implementing Monitoring Data into Probabilistic Analysis of Existing Embankment Dams

Veljko Pujević, Miloš Marjanović, Ljubo Divac, Dejan Divac
1 citations
Applied Sciences
Dam Engineering and Safety
0.95
article

Methodology for Implementing Monitoring Data into Probabilistic Analysis of Existing Embankment Dams

Veljko Pujević, Miloš Marjanović, Ljubo Divac, Dejan Divac
article en
1 citations

Abstract

Monitoring data provide valuable information on embankment dam behavior but are typically not integrated into a classical probabilistic safety assessment. This paper introduces a Bayesian-inspired methodology to directly integrate actual dam monitoring records into a Monte Carlo probabilistic safety assessment using a finite element framework, without recalibrating the original input parameters ‘distributions. After the baseline (unweighted) set of simulations is generated, the method assigns a weight coefficient to each simulation outcome based on the likelihood of matching monitoring data, effectively updating the baseline probabilistic analysis results. Therefore, such “weighted” analysis produces an updated probability distribution of the dam’s factor of safety (FS) that reflects both prior uncertainty of model parameters and actual monitoring data. To illustrate the approach, a case study of a rockfill triaxial test specimen is analyzed: a baseline probabilistic analysis yields a mean FS ~1.7, whereas the weighted analysis incorporating monitoring data reduces the mean FS to ~1.5 and narrows the variability. The weighted analysis suggests less favorable conditions than the baseline projections. This methodology offers a transparent, computationally tractable route for embedding monitoring evidence into reliability calculations, producing more reflective safety estimates of actual dam behavior.

Applied SciencesVol. 15(12)
University of Belgrade (RS)
Openalex Percentile: Top 25%
Dam Engineering and Safety
0.95
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.