Digital planning, prefabrication and industrialized construction methods in a complex large‐scale project in Munich

Abstract This paper presents the BMW body shop construction project in Munich as a case study for the effective application of digital planning, industrialized construction, and precast building methods in large‐scale industrial developments. The article outlines key project details and highlights specific innovations in planning and execution, including the use of advanced 4D Building Information Modeling (BIM), pre‐stressed precast concrete columns, and the transformation of traditionally in‐situ concrete cores into fully prefabricated units. These solutions were tailored to meet complex structural requirements and were supported by integrated digital modeling and precise on‐site coordination. Digital planning and industrialized construction using precast elements contribute significantly to keeping large projects on budget and on schedule, while also increasing overall construction productivity. Accelerated construction timelines and reduced on‐site labor help address growing labor shortages in the industry. Furthermore, component optimization—such as minimizing wall thickness and reinforcement through prefabrication—can support sustainability goals. To fully leverage these benefits, the use of precast systems should be considered from the earliest design phases. However, many structural engineers still rely on conventional in‐situ methods, limiting the adoption of more efficient alternatives. This case underscores the advantages of industrialized construction and demonstrates its practical potential. The findings contribute to both academic discourse and practical implementation, emphasizing the need for broader education, understanding, and innovation in prefabricated building systems.

Authors

Publication Details

Journal
Structural Concrete
Published
2025-06-17
DOI
https://doi.org/10.1002/suco.70174
Citations
2
Primary Topic
Flexible and Reconfigurable Manufacturing Systems
Type
article
Field-Weighted Citation Impact
2.48
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Digital planning, prefabrication and industrialized construction methods in a complex large‐scale project in Munich

Andreas Pürgstaller, Hannes Fischnaller
2 citations
Structural Concrete
Flexible and Reconfigurable Manufacturing Systems
2.48
article

Digital planning, prefabrication and industrialized construction methods in a complex large‐scale project in Munich

Andreas Pürgstaller, Hannes Fischnaller
article en
2 citations

Abstract

Abstract This paper presents the BMW body shop construction project in Munich as a case study for the effective application of digital planning, industrialized construction, and precast building methods in large‐scale industrial developments. The article outlines key project details and highlights specific innovations in planning and execution, including the use of advanced 4D Building Information Modeling (BIM), pre‐stressed precast concrete columns, and the transformation of traditionally in‐situ concrete cores into fully prefabricated units. These solutions were tailored to meet complex structural requirements and were supported by integrated digital modeling and precise on‐site coordination. Digital planning and industrialized construction using precast elements contribute significantly to keeping large projects on budget and on schedule, while also increasing overall construction productivity. Accelerated construction timelines and reduced on‐site labor help address growing labor shortages in the industry. Furthermore, component optimization—such as minimizing wall thickness and reinforcement through prefabrication—can support sustainability goals. To fully leverage these benefits, the use of precast systems should be considered from the earliest design phases. However, many structural engineers still rely on conventional in‐situ methods, limiting the adoption of more efficient alternatives. This case underscores the advantages of industrialized construction and demonstrates its practical potential. The findings contribute to both academic discourse and practical implementation, emphasizing the need for broader education, understanding, and innovation in prefabricated building systems.

Structural ConcreteVol. 26(4)
Openalex Percentile: Top 10%
Flexible and Reconfigurable Manufacturing Systems
2.48
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.