Production–inventory planning in high-tech low-volume manufacturing supply chains

This paper studies production–inventory planning in high-tech low-volume manufacturing supply chains, where long production lead times, complex network structures, multiple capacity constraints, as well as non-stationary demand and supply uncertainty, complicate production and safety stock placement decisions. The majority of academic approaches considers these problems under limiting assumptions about the system, while practitioners mostly rely on suboptimal heuristic integration of plans. We bridge the gap between stylized stochastic inventory models and industrial production planning practices by developing novel practice-driven multi-stage stochastic programming models. We validate our methodology in the uncapacitated single-product setting without lead time uncertainty by benchmarking strategic safety stock levels against an approach based on the seminal stochastic service model, which we tailor to accommodate the non-stationary demand. Additionally, we analyze the impact of capacity constraints and lead time uncertainty on safety stock requirements, and demonstrate how the performance of the benchmark solution regresses under these complexities. Finally, to support production–inventory decisions in view of the short life cycles of high-tech products, we adapt our modeling framework to new product introduction planning under modular product design, motivated by the setting of our industry partner, ASML. Following a fast-time-to-market strategy, we investigate optimal ramp-up and phase-out plans given interdependent demand and supply uncertainty due to risks in technology development. This study highlights the flexibility of our approach in addressing specific challenges encountered in real-world planning problems.

Authors

Institutions

Publication Details

Journal
International Journal of Production Economics
Published
2025-06-16
DOI
https://doi.org/10.1016/j.ijpe.2025.109687
Citations
2
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
2.48

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Production–inventory planning in high-tech low-volume manufacturing supply chains

M.P.M. Hendriks, Yasemin Merzifonluoğlu, Renata Sotirov, Tijn Fleuren
2 citations
International Journal of Production Economics
Scheduling and Optimization Algorithms
2.48
article

Production–inventory planning in high-tech low-volume manufacturing supply chains

M.P.M. Hendriks, Yasemin Merzifonluoğlu, Renata Sotirov, Tijn Fleuren
article en
2 citations

Abstract

This paper studies production–inventory planning in high-tech low-volume manufacturing supply chains, where long production lead times, complex network structures, multiple capacity constraints, as well as non-stationary demand and supply uncertainty, complicate production and safety stock placement decisions. The majority of academic approaches considers these problems under limiting assumptions about the system, while practitioners mostly rely on suboptimal heuristic integration of plans. We bridge the gap between stylized stochastic inventory models and industrial production planning practices by developing novel practice-driven multi-stage stochastic programming models. We validate our methodology in the uncapacitated single-product setting without lead time uncertainty by benchmarking strategic safety stock levels against an approach based on the seminal stochastic service model, which we tailor to accommodate the non-stationary demand. Additionally, we analyze the impact of capacity constraints and lead time uncertainty on safety stock requirements, and demonstrate how the performance of the benchmark solution regresses under these complexities. Finally, to support production–inventory decisions in view of the short life cycles of high-tech products, we adapt our modeling framework to new product introduction planning under modular product design, motivated by the setting of our industry partner, ASML. Following a fast-time-to-market strategy, we investigate optimal ramp-up and phase-out plans given interdependent demand and supply uncertainty due to risks in technology development. This study highlights the flexibility of our approach in addressing specific challenges encountered in real-world planning problems.

International Journal of Production EconomicsVol. 288
Tilburg University (NL), ASML (Netherlands) (NL)
ASML
Industry, innovation and infrastructure
Openalex Percentile: Top 10%
Scheduling and Optimization Algorithms
2.48
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.