A Constraint Programming Approach for the Multi-Robot Multibay Unit Load Pre-marshalling Problem

Autonomous mobile robots are increasingly employed to automate intralogistics operations. This work addresses the multi-robot multibay unit load pre-marshalling problem, wherein robots optimize warehouse processes during peak times by proactively reshufing inventory based on anticipated demand during idle periods. The problem involves reshufing a warehouse according to priority classes using multiple robots, necessitating coordinated tour planning between reshufing moves while respecting dependencies. A stage-based constraint programming model is introduced that determines reshufing moves and plans robot tours while considering dependencies between moves. Our objective is to minimize the makespan for the minimum number of moves. The results demonstrate the limitations of the constraint programming model and offer valuable insights for future heuristic approaches.

Authors

Institutions

Publication Details

Journal
Procedia CIRP
Published
2025-01-01
DOI
https://doi.org/10.1016/j.procir.2025.02.151
Citations
1
Primary Topic
Advanced Manufacturing and Logistics Optimization
Type
article
Field-Weighted Citation Impact
1.24

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

A Constraint Programming Approach for the Multi-Robot Multibay Unit Load Pre-marshalling Problem

Anne Meyer, Thomas Bömer, Max Disselnmeyer
1 citations
Procedia CIRP
Advanced Manufacturing and Logistics Optimization
1.24
article

A Constraint Programming Approach for the Multi-Robot Multibay Unit Load Pre-marshalling Problem

Anne Meyer, Thomas Bömer, Max Disselnmeyer
article en
1 citations

Abstract

Autonomous mobile robots are increasingly employed to automate intralogistics operations. This work addresses the multi-robot multibay unit load pre-marshalling problem, wherein robots optimize warehouse processes during peak times by proactively reshufing inventory based on anticipated demand during idle periods. The problem involves reshufing a warehouse according to priority classes using multiple robots, necessitating coordinated tour planning between reshufing moves while respecting dependencies. A stage-based constraint programming model is introduced that determines reshufing moves and plans robot tours while considering dependencies between moves. Our objective is to minimize the makespan for the minimum number of moves. The results demonstrate the limitations of the constraint programming model and offer valuable insights for future heuristic approaches.

Procedia CIRPVol. 134
Karlsruhe Institute of Technology (DE), TU Dortmund University (DE)
Deutsche Forschungsgemeinschaft
Openalex Percentile: Top 18%
Advanced Manufacturing and Logistics Optimization
1.24
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.