Method for vehicle route planning in large-scale construction sites based on low-density floating car data

Large-scale construction sites have frequently changing and complex road networks, which can easily lead to inefficiencies and even traffic accidents due to poor vehicle path planning. This study addresses the gap in studying route planning for large-scale construction site vehicles. By constructing cost calculation model based on vehicle length, segment length, and low-density floating vehicle speed, the limitation of relying on high-density floating vehicle data for effective calculations is overcome. This combination ensures the safety by adjusting routes in a timely manner based on changes in data. An enhanced Dijkstra-ACO algorithm is proposed to obtain the final route based on the improvements of search range determination and modes of pheromone change. Experiments is conducted using real large-scale construction sites, and comparisons are made with mainstream methods, all of which were optimized by the present method. Meanwhile, compared to the classic ACO algorithm, average convergence speed is improved by 5.1%. Furthermore, accuracy and search range are guaranteed. The results demonstrate that the proposed method not only ensures transportation efficiency but also enhances safety effectively.

Authors

Institutions

Publication Details

Published
2025-06-16
DOI
https://doi.org/10.1117/12.3059319
Primary Topic
Transportation Systems and Logistics
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Method for vehicle route planning in large-scale construction sites based on low-density floating car data

Jianqing Wu, Xiongjun Fu, Yuan Tian, Xu Pan et al.
Transportation Systems and Logistics
article

Method for vehicle route planning in large-scale construction sites based on low-density floating car data

Jianqing Wu, Xiongjun Fu, Yuan Tian, Xu Pan, Ziyu Liu, Zheng Zheng, Cong Du, Xixun Yu
article en

Abstract

Large-scale construction sites have frequently changing and complex road networks, which can easily lead to inefficiencies and even traffic accidents due to poor vehicle path planning. This study addresses the gap in studying route planning for large-scale construction site vehicles. By constructing cost calculation model based on vehicle length, segment length, and low-density floating vehicle speed, the limitation of relying on high-density floating vehicle data for effective calculations is overcome. This combination ensures the safety by adjusting routes in a timely manner based on changes in data. An enhanced Dijkstra-ACO algorithm is proposed to obtain the final route based on the improvements of search range determination and modes of pheromone change. Experiments is conducted using real large-scale construction sites, and comparisons are made with mainstream methods, all of which were optimized by the present method. Meanwhile, compared to the classic ACO algorithm, average convergence speed is improved by 5.1%. Furthermore, accuracy and search range are guaranteed. The results demonstrate that the proposed method not only ensures transportation efficiency but also enhances safety effectively.

Shandong University (CN), Construction Development (Qatar) (QA), Shandong Management University (CN)
Sustainable cities and communities
Openalex Percentile: Top 86%
Transportation Systems and Logistics
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Method for vehicle route planning in large-scale construction sites based on low-density floating car data — Jianqing Wu, Xiongjun Fu, et al. · (2025) | TGRS Research Map | TGRS