Risk-Driven Deferral of Distribution Transformer Investments in the E-Mobility Era

The recent increase in electric vehicles has introduced extra loads to existing distribution infrastructures. Residential charging solutions are one of the challenges that will be addressed in the e-mobility era. Traditionally, distribution system operators follow a conservative approach to ensure their customers have uninterruptable and high-quality access to electrical energy. Therefore, upgrading the grid infrastructure is not a new approach; however, the widespread distribution of EVs across the grid requires immediate infrastructure investments, necessitating a significant budget allocation. Therefore, this paper suggests a risk-driven distribution transformer investment deferral to gain time to plan and process investment decisions effectively. By focusing on overall and additional demand and not improbable peak scenarios, this study shows that one can delay infrastructure investments through sensible risk management without compromising grid reliability in the transition to widespread electric mobility.

Authors

Institutions

Publication Details

Published
2025-05-20
DOI
https://doi.org/10.1109/cpe-powereng63314.2025.11027283
Primary Topic
Electricity Theft Detection Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Risk-Driven Deferral of Distribution Transformer Investments in the E-Mobility Era

Gokturk Poyrazoglu, Halil Hilmi Namli
Electricity Theft Detection Techniques
article

Risk-Driven Deferral of Distribution Transformer Investments in the E-Mobility Era

Gokturk Poyrazoglu, Halil Hilmi Namli
article en

Abstract

The recent increase in electric vehicles has introduced extra loads to existing distribution infrastructures. Residential charging solutions are one of the challenges that will be addressed in the e-mobility era. Traditionally, distribution system operators follow a conservative approach to ensure their customers have uninterruptable and high-quality access to electrical energy. Therefore, upgrading the grid infrastructure is not a new approach; however, the widespread distribution of EVs across the grid requires immediate infrastructure investments, necessitating a significant budget allocation. Therefore, this paper suggests a risk-driven distribution transformer investment deferral to gain time to plan and process investment decisions effectively. By focusing on overall and additional demand and not improbable peak scenarios, this study shows that one can delay infrastructure investments through sensible risk management without compromising grid reliability in the transition to widespread electric mobility.

Özyeğin University (TR)
Decent work and economic growth
Openalex Percentile: Top 88%
Electricity Theft Detection Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.