Future scenarios for 100% renewables in Greece, untapped potential of marine renewable energies

This study examines the potential contribution of marine renewable generators in Greece, in order to achieve a 100% renewable energy system by 2050. Using PyPSA-Eur, a cost-optimization model of the European energy system, possible energy transition pathways are explored, across five-year intervals from 2030 to 2050. For each five-year target, a new cost assumption dataset is used, one that follows estimated cost reduction learning rates. This version of the model is called PyPSA-Eur-MREL, and is modified to include marine power generators, i.e. floating wind, wave, tidal and floating solar, but also high fidelity climate data, in the scale of 5.5 km 2 for wind and 4 km 2 for wave resources. Three different approaches were employed in this investigation: greenfield, generator constrained, and a high-load scenario inspired by Greece’s National Energy and Climate Plan (NECP). The analysis focused on generator capacity and performance, the levels of utilization and availability of each energy carrier and the land-use impact of onshore and offshore generators. While the first two scenarios exhibit similar overall system capacities, they differ in land-use requirements, with the constrained case installing more bottom-fixed wind turbines (1.2 GW), thereby reducing land occupation. The high-load scenario introduces floating wind turbines (4.5 GW), however, the scale of onshore installations remains substantial, covering nearly one-third of Greece’s total land area. • Bottom fixed offshore turbines installed in low demand cases, 4.5 GW floating turbines introduced for high demand scenario in Central Aegean and Cretan Seas. • A survival function developed shows that higher renewable generator capacity does not indicate higher utilization. • Generator capacity constrained approach shows a reduced dependability on storage units, with marginally higher system costs. • Land-use benefits from allocating more capacity offshore, 2243 km 2 of onshore land for installations are traded for 76 km 2 offshore.

Authors

Institutions

Publication Details

Journal
Energy Conversion and Management X
Published
2025-06-13
DOI
https://doi.org/10.1016/j.ecmx.2025.101085
Citations
1
Primary Topic
Maritime Transport Emissions and Efficiency
Type
article
Field-Weighted Citation Impact
0.80
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Future scenarios for 100% renewables in Greece, untapped potential of marine renewable energies

George Lavidas, Lefteris Mezilis
1 citations
Energy Conversion and Management X
Maritime Transport Emissions and Efficiency
0.80
article

Future scenarios for 100% renewables in Greece, untapped potential of marine renewable energies

George Lavidas, Lefteris Mezilis
article en
1 citations

Abstract

This study examines the potential contribution of marine renewable generators in Greece, in order to achieve a 100% renewable energy system by 2050. Using PyPSA-Eur, a cost-optimization model of the European energy system, possible energy transition pathways are explored, across five-year intervals from 2030 to 2050. For each five-year target, a new cost assumption dataset is used, one that follows estimated cost reduction learning rates. This version of the model is called PyPSA-Eur-MREL, and is modified to include marine power generators, i.e. floating wind, wave, tidal and floating solar, but also high fidelity climate data, in the scale of 5.5 km 2 for wind and 4 km 2 for wave resources. Three different approaches were employed in this investigation: greenfield, generator constrained, and a high-load scenario inspired by Greece’s National Energy and Climate Plan (NECP). The analysis focused on generator capacity and performance, the levels of utilization and availability of each energy carrier and the land-use impact of onshore and offshore generators. While the first two scenarios exhibit similar overall system capacities, they differ in land-use requirements, with the constrained case installing more bottom-fixed wind turbines (1.2 GW), thereby reducing land occupation. The high-load scenario introduces floating wind turbines (4.5 GW), however, the scale of onshore installations remains substantial, covering nearly one-third of Greece’s total land area. • Bottom fixed offshore turbines installed in low demand cases, 4.5 GW floating turbines introduced for high demand scenario in Central Aegean and Cretan Seas. • A survival function developed shows that higher renewable generator capacity does not indicate higher utilization. • Generator capacity constrained approach shows a reduced dependability on storage units, with marginally higher system costs. • Land-use benefits from allocating more capacity offshore, 2243 km 2 of onshore land for installations are traded for 76 km 2 offshore.

Energy Conversion and Management XVol. 27
Delft University of Technology (NL)
Affordable and clean energy
Openalex Percentile: Top 28%
Maritime Transport Emissions and Efficiency
0.80
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Future scenarios for 100% renewables in Greece, untapped potential of marine renewable energies — George Lavidas, Lefteris Mezilis · Energy Conversion and Management X (2025) | TGRS Research Map | TGRS