Designing a Model for Bi-criteria Objective Scheduling at Flexible Flowshop Production in Finishing Furniture Industries

The bi-criteria objective scheduling is essential in the Jepara furniture industry due to its competitiveness. Scheduling that not only considers the company's profits but also takes into account the customer's perspective can add significant value to the company. Based on that, this paper proposed a mathematical model for the furniture finishing industry. Then it transformed into a Microsoft Excel Solver model. Cost calculation is also considered to choose the best model. The system's characteristic is flexible flow shop production, not identical at the last stage, and sequence-dependent set up time. The objective of scheduling is to minimize total maximum completion time and total weighted tardiness. There are 3 scenarios in this paper, company focused, customer, and bi-criteria objective. After running the model, scenario 3 is the best choice for completing priority orders on time, while scenario 1 is ideal when seeking efficiency in production with delays being less of a concern.

Authors

Institutions

Publication Details

Journal
JURNAL SISTEM INFORMASI BISNIS
Published
2025-04-15
DOI
https://doi.org/10.14710/vol15iss2pp152-158
Primary Topic
Scheduling and Optimization Algorithms
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Designing a Model for Bi-criteria Objective Scheduling at Flexible Flowshop Production in Finishing Furniture Industries

Aries Susanty, Singgih Saptadi, Achmad Fawwaz Bahaudin
1 links
JURNAL SISTEM INFORMASI BISNIS
Scheduling and Optimization Algorithms
article

Designing a Model for Bi-criteria Objective Scheduling at Flexible Flowshop Production in Finishing Furniture Industries

Aries Susanty, Singgih Saptadi, Achmad Fawwaz Bahaudin
article en

Abstract

The bi-criteria objective scheduling is essential in the Jepara furniture industry due to its competitiveness. Scheduling that not only considers the company's profits but also takes into account the customer's perspective can add significant value to the company. Based on that, this paper proposed a mathematical model for the furniture finishing industry. Then it transformed into a Microsoft Excel Solver model. Cost calculation is also considered to choose the best model. The system's characteristic is flexible flow shop production, not identical at the last stage, and sequence-dependent set up time. The objective of scheduling is to minimize total maximum completion time and total weighted tardiness. There are 3 scenarios in this paper, company focused, customer, and bi-criteria objective. After running the model, scenario 3 is the best choice for completing priority orders on time, while scenario 1 is ideal when seeking efficiency in production with delays being less of a concern.

JURNAL SISTEM INFORMASI BISNISVol. 15(2)
Diponegoro University (ID)
Openalex Percentile: Top 81%
Scheduling and Optimization Algorithms
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.