Reserve Optimization Considering Reserve Deployment Process

With the continuous development of renewable energy power generation technologies such as wind and solar and the increasing popularity of renewable energy, the volatility and uncertainty in the system have significantly increased and are doubly superimposed. Therefore, requirements are not only imposed on the quantity of reserve but also on the response speed. Firstly, based on the traditional unit commitment model, this paper jointly considers the capacity reserve and ramping reserve of the power system and constructs a unit commitment model that takes into account the supply and demand constraints of both types of reserves simultaneously. Then, on the basis of this model, a reserve optimization model considering the reserve energy delivery process is proposed. Finally, a reliability cost model is established. Based on the cost-benefit/trade-off optimization concept, the optimal reserve capacity is determined through the trade-off between the reliability cost and the reserve cost. The model is transformed into a mixed-integer linear programming model that can be directly called by the commercial solver CPLEX, and the effectiveness of the model is verified by a modified IEEE 33-node distribution network.

Authors

Institutions

Publication Details

Published
2025-03-28
DOI
https://doi.org/10.1109/aeees64634.2025.11019283
Primary Topic
Electric Power System Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Reserve Optimization Considering Reserve Deployment Process

Sheng‐Qi Zhou, Chen Li, Zihan Wang, Hong Zhang et al.
Electric Power System Optimization
article

Reserve Optimization Considering Reserve Deployment Process

Sheng‐Qi Zhou, Chen Li, Zihan Wang, Hong Zhang, Zhipeng Wu, Xiangsheng Liu
article en

Abstract

With the continuous development of renewable energy power generation technologies such as wind and solar and the increasing popularity of renewable energy, the volatility and uncertainty in the system have significantly increased and are doubly superimposed. Therefore, requirements are not only imposed on the quantity of reserve but also on the response speed. Firstly, based on the traditional unit commitment model, this paper jointly considers the capacity reserve and ramping reserve of the power system and constructs a unit commitment model that takes into account the supply and demand constraints of both types of reserves simultaneously. Then, on the basis of this model, a reserve optimization model considering the reserve energy delivery process is proposed. Finally, a reliability cost model is established. Based on the cost-benefit/trade-off optimization concept, the optimal reserve capacity is determined through the trade-off between the reliability cost and the reserve cost. The model is transformed into a mixed-integer linear programming model that can be directly called by the commercial solver CPLEX, and the effectiveness of the model is verified by a modified IEEE 33-node distribution network.

Shandong University (CN), State Grid Corporation of China (China) (CN)
Openalex Percentile: Top 89%
Electric Power System Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Reserve Optimization Considering Reserve Deployment Process — Sheng‐Qi Zhou, Chen Li, et al. · (2025) | TGRS Research Map | TGRS