Analisis Kelayakan Pembangunan PLTS pada Kafe Pondok Juice

Indonesia, which is located on the equator, has great potential to utilize solar energy, with an average solar radiation reaching 4.80 kWh/m² per day. This provides an advantage in the development of Solar Power Plants (SPP), one of which is through the installation of rooftop on the roof of the building as a source of electrical energy. This study aims to analyze the feasibility of SPP development by considering the techno-economic aspects of the Pondok Juice cafe. The total real electrical energy consumption required by the Pondok Juice cafe is 32,548 Wh/day. Assuming a system loss of 15%, the total electrical energy requirement that must be supplied by the SPP is 37,430.2 Wh/day. The initial investment projection is IDR 204,265,197, with operational and maintenance costs for 25 years of IDR 105,760,028. The investment feasibility analysis shows NPV of IDR 441,523,820.10, BCR 4.11, DPP ±5 years, and IRR 15.55%, which proves that this SPP planning is feasible to implement.

Authors

Institutions

Publication Details

Journal
Venus Jurnal Publikasi Rumpun Ilmu Teknik 
Published
2025-05-22
DOI
https://doi.org/10.61132/venus.v3i3.856
Primary Topic
Agriculture and Agroindustry Studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Kelayakan Pembangunan PLTS pada Kafe Pondok Juice

Risse Entikaria Rachmanita, Nur Faizin, Syahrir Rojib, Ahmad Fahriannur
Venus Jurnal Publikasi Rumpun Ilmu Teknik 
Agriculture and Agroindustry Studies
article

Analisis Kelayakan Pembangunan PLTS pada Kafe Pondok Juice

Risse Entikaria Rachmanita, Nur Faizin, Syahrir Rojib, Ahmad Fahriannur
article en

Abstract

Indonesia, which is located on the equator, has great potential to utilize solar energy, with an average solar radiation reaching 4.80 kWh/m² per day. This provides an advantage in the development of Solar Power Plants (SPP), one of which is through the installation of rooftop on the roof of the building as a source of electrical energy. This study aims to analyze the feasibility of SPP development by considering the techno-economic aspects of the Pondok Juice cafe. The total real electrical energy consumption required by the Pondok Juice cafe is 32,548 Wh/day. Assuming a system loss of 15%, the total electrical energy requirement that must be supplied by the SPP is 37,430.2 Wh/day. The initial investment projection is IDR 204,265,197, with operational and maintenance costs for 25 years of IDR 105,760,028. The investment feasibility analysis shows NPV of IDR 441,523,820.10, BCR 4.11, DPP ±5 years, and IRR 15.55%, which proves that this SPP planning is feasible to implement.

Venus Jurnal Publikasi Rumpun Ilmu Teknik Vol. 3(3)
Universitas Jember (ID), Politeknik Negeri Jember
Openalex Percentile: Top 80%
Agriculture and Agroindustry Studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.