Failure Characteristics and Numerical Simulation of Corrosion Control in Welding Seams and T-Zone of the Water Injection Pipeline

Abstract The water injection pipeline is the main facility of water injection development in oilfields. With the complexity of water injection mediums and the extension of service years, the frequency of pipeline corrosion failure increases year by year. Corrosion failures are particularly prevalent at welding seams and T-zones, but a comprehensive understanding of their corrosion characteristics and mechanisms remains limited. Therefore, this article studied corrosion failure behaviors of welding seams and T-zone in water injection pipelines under typical working conditions through laboratory experiments and numerical simulations and proposed the anticorrosion measure of the loose joint “blind pipes.” The results indicate that combined effects of solid particle erosion, galvanic corrosion, crack corrosion, and under-deposit corrosion cause different degrees of cracks in the corrosion product layer of the water injection pipeline, ultimately forming compounds such as Fe2O3 and Fe3O4. As flow velocity increases, flow field changes become more pronounced in welding seams and T-zone, exacerbating erosion and corrosion. However, compared with small-bore pipelines, the erosion and corrosion are alleviated with the increase in diameter. In addition to anticorrosion coating and adding fungicide to the injection medium, the application of loose joint “blind pipes” effectively stabilizes the flow field, thereby reducing both flow velocity and corrosion rates in the T-zone. When the length and diameter of the blind pipe meet L = 3D, the maximum flow velocity and corrosion rate decrease by 8.9% and 23.8%, respectively, which effectively helps to prevent and control corrosion perforation in high-pressure water injection pipelines.

Authors

Institutions

Publication Details

Journal
Journal of energy resources technology.
Published
2025-06-09
DOI
https://doi.org/10.1115/1.4068885
Primary Topic
Non-Destructive Testing Techniques
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Failure Characteristics and Numerical Simulation of Corrosion Control in Welding Seams and T-Zone of the Water Injection Pipeline

Xuyao Wang, Zhihua Wang, Haozheng Zhang, Cong Wang
Journal of energy resources technology.
Non-Destructive Testing Techniques
article

Failure Characteristics and Numerical Simulation of Corrosion Control in Welding Seams and T-Zone of the Water Injection Pipeline

Xuyao Wang, Zhihua Wang, Haozheng Zhang, Cong Wang
article en

Abstract

Abstract The water injection pipeline is the main facility of water injection development in oilfields. With the complexity of water injection mediums and the extension of service years, the frequency of pipeline corrosion failure increases year by year. Corrosion failures are particularly prevalent at welding seams and T-zones, but a comprehensive understanding of their corrosion characteristics and mechanisms remains limited. Therefore, this article studied corrosion failure behaviors of welding seams and T-zone in water injection pipelines under typical working conditions through laboratory experiments and numerical simulations and proposed the anticorrosion measure of the loose joint “blind pipes.” The results indicate that combined effects of solid particle erosion, galvanic corrosion, crack corrosion, and under-deposit corrosion cause different degrees of cracks in the corrosion product layer of the water injection pipeline, ultimately forming compounds such as Fe2O3 and Fe3O4. As flow velocity increases, flow field changes become more pronounced in welding seams and T-zone, exacerbating erosion and corrosion. However, compared with small-bore pipelines, the erosion and corrosion are alleviated with the increase in diameter. In addition to anticorrosion coating and adding fungicide to the injection medium, the application of loose joint “blind pipes” effectively stabilizes the flow field, thereby reducing both flow velocity and corrosion rates in the T-zone. When the length and diameter of the blind pipe meet L = 3D, the maximum flow velocity and corrosion rate decrease by 8.9% and 23.8%, respectively, which effectively helps to prevent and control corrosion perforation in high-pressure water injection pipelines.

Journal of energy resources technology.Vol. 1(5)
Northeast Petroleum University (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 87%
Non-Destructive Testing Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Failure Characteristics and Numerical Simulation of Corrosion Control in Welding Seams and T-Zone of the Water Injection Pipeline — Xuyao Wang, Zhihua Wang, et al. · Journal of energy resources technology. (2025) | TGRS Research Map | TGRS