Delay Analysis of Infrastructure Construction Projects in India

Abstract This study investigates the causes and mitigation strategies for delays in infrastructure construction projects in India, with a focus on roads and bridges. Through a comprehensive methodology involving a questionnaire survey of 72 construction management professionals and the application of the Relative Importance Index (RII), the research identifies material-related issues (RII = 0.562), construction site challenges (RII = 0.555), and contractor-related inefficiencies (RII = 0.506) as the primary causes of delays. Key factors include late material deliveries, land acquisition hurdles, design errors, and delayed payments. Sector-specific analysis reveals land acquisition as critical for road projects (RII = 0.68) and design errors for bridges (RII = 0.55). Factor analysis further categorizes delays into four dimensions: Resource & Supply Chain, Government & External Factors, Contractor Management, and Design & Planning. The study proposes targeted mitigation strategies, such as securing reliable suppliers, proactive stakeholder engagement, and advanced planning tools like BIM. Emphasizing the importance of time management alongside cost and quality, the findings provide actionable insights for stakeholders to enhance project efficiency and reduce delays in India’s infrastructure sector.

Authors

Institutions

Publication Details

Journal
Journal of The Institution of Engineers (India) Series A
Published
2025-06-06
DOI
https://doi.org/10.1007/s40030-025-00899-5
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Delay Analysis of Infrastructure Construction Projects in India

L. Pinky Devi, Sindhu
Journal of The Institution of Engineers (India) Series A
Construction Project Management and Performance
article

Delay Analysis of Infrastructure Construction Projects in India

L. Pinky Devi, Sindhu
article en

Abstract

Abstract This study investigates the causes and mitigation strategies for delays in infrastructure construction projects in India, with a focus on roads and bridges. Through a comprehensive methodology involving a questionnaire survey of 72 construction management professionals and the application of the Relative Importance Index (RII), the research identifies material-related issues (RII = 0.562), construction site challenges (RII = 0.555), and contractor-related inefficiencies (RII = 0.506) as the primary causes of delays. Key factors include late material deliveries, land acquisition hurdles, design errors, and delayed payments. Sector-specific analysis reveals land acquisition as critical for road projects (RII = 0.68) and design errors for bridges (RII = 0.55). Factor analysis further categorizes delays into four dimensions: Resource & Supply Chain, Government & External Factors, Contractor Management, and Design & Planning. The study proposes targeted mitigation strategies, such as securing reliable suppliers, proactive stakeholder engagement, and advanced planning tools like BIM. Emphasizing the importance of time management alongside cost and quality, the findings provide actionable insights for stakeholders to enhance project efficiency and reduce delays in India’s infrastructure sector.

Journal of The Institution of Engineers (India) Series A
Manipal Academy of Higher Education (IN), Acharya Nagarjuna University (IN)
Openalex Percentile: Top 85%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.