Multi-Skilled Project Scheduling for High-End Equipment Development Considering Newcomer Cultivation and Duration Uncertainty

Traditional off-the-job training is becoming ineffective in high-end equipment research and development (R&D) projects due to the contradiction between rapid technological progress and the slow growth of newcomers, calling for “on-the-job mentoring” to enable synchronized advancement of project execution and newcomer cultivation. For this, we propose the multi-skilled project scheduling problem with newcomer cultivation under uncertain durations (MSPSP-NCU) and abstract it as a stochastic programming model. The model aims to minimize expected makespan and maximize newcomers’ skill efficiency by optimizing workforce assignment that enables experienced workers to mentor newcomers while simultaneously optimizing task scheduling. Solving the model is blocked by the inherently NP-hard nature of the project scheduling problem and the stochasticity of the durations. Therefore, we put forward an adaptive simulation–optimization approach featuring two-fold: a simulation module capable of dynamically adjusting sample sizes based on convergence feedback and evaluating solutions with improved efficiency and stable accuracy; a tailored non-dominated sorting genetic algorithm II (NSGA-II) with adaptive evolutionary operators that enhance search effectiveness and ensure the identification of a well-distributed Pareto front. By using data from an aerospace component R&D project, the proposed approach is validated for its performance in identifying Pareto-optimal solutions. Several personalized rules are designed by integrating workforce development strategies into the selection process, providing actionable guidelines for cultivating newcomers in technology-intensive projects.

Authors

Institutions

Publication Details

Journal
Systems
Published
2025-06-06
DOI
https://doi.org/10.3390/systems13060448
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-Skilled Project Scheduling for High-End Equipment Development Considering Newcomer Cultivation and Duration Uncertainty

Lei Wang, Shanshan Liu, Ronggui Ding, Yaohui Liu
1 links
Systems
Manufacturing Process and Optimization
article

Multi-Skilled Project Scheduling for High-End Equipment Development Considering Newcomer Cultivation and Duration Uncertainty

Lei Wang, Shanshan Liu, Ronggui Ding, Yaohui Liu
article en

Abstract

Traditional off-the-job training is becoming ineffective in high-end equipment research and development (R&D) projects due to the contradiction between rapid technological progress and the slow growth of newcomers, calling for “on-the-job mentoring” to enable synchronized advancement of project execution and newcomer cultivation. For this, we propose the multi-skilled project scheduling problem with newcomer cultivation under uncertain durations (MSPSP-NCU) and abstract it as a stochastic programming model. The model aims to minimize expected makespan and maximize newcomers’ skill efficiency by optimizing workforce assignment that enables experienced workers to mentor newcomers while simultaneously optimizing task scheduling. Solving the model is blocked by the inherently NP-hard nature of the project scheduling problem and the stochasticity of the durations. Therefore, we put forward an adaptive simulation–optimization approach featuring two-fold: a simulation module capable of dynamically adjusting sample sizes based on convergence feedback and evaluating solutions with improved efficiency and stable accuracy; a tailored non-dominated sorting genetic algorithm II (NSGA-II) with adaptive evolutionary operators that enhance search effectiveness and ensure the identification of a well-distributed Pareto front. By using data from an aerospace component R&D project, the proposed approach is validated for its performance in identifying Pareto-optimal solutions. Several personalized rules are designed by integrating workforce development strategies into the selection process, providing actionable guidelines for cultivating newcomers in technology-intensive projects.

SystemsVol. 13(6)
Shandong University (CN), Shandong Management University (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 82%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.