Analysis of deep foundation pit enclosure construction and its surrounding settlement change

Abstract The paper takes the deep foundation pit project of Xiaoshan Qunxian Road West Extension Project as an example and analyses the problem of surrounding surface settlement caused by deep foundation pit excavation. The project foundation pit is about 30 meters deep, the surrounding environment is complex, and the settlement control requirements are strict. The study shows that soil stress release, groundwater change, deformation of supporting structures, and construction disturbance are the main factors leading to settlement. To effectively control settlement, the project has adopted multi-dimensional prevention and control measures such as a diaphragm wall plus an internal support system, layered precipitation and intelligent monitoring, and refined construction. The monitoring results show that the maximum settlement at the pit side is lower than the design limit, which verifies the effectiveness of the measures. Future research can further explore the application of soil improvement technology under complex geological conditions to enhance the settlement control capability of ultra-deep foundation pits.

Authors

Institutions

Publication Details

Journal
Journal of Physics Conference Series
Published
2025-05-01
DOI
https://doi.org/10.1088/1742-6596/3021/1/012100
Primary Topic
Civil and Geotechnical Engineering Research
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analysis of deep foundation pit enclosure construction and its surrounding settlement change

Shifeng Xue, Zan Zhou
Journal of Physics Conference Series
Civil and Geotechnical Engineering Research
article

Analysis of deep foundation pit enclosure construction and its surrounding settlement change

Shifeng Xue, Zan Zhou
article en

Abstract

Abstract The paper takes the deep foundation pit project of Xiaoshan Qunxian Road West Extension Project as an example and analyses the problem of surrounding surface settlement caused by deep foundation pit excavation. The project foundation pit is about 30 meters deep, the surrounding environment is complex, and the settlement control requirements are strict. The study shows that soil stress release, groundwater change, deformation of supporting structures, and construction disturbance are the main factors leading to settlement. To effectively control settlement, the project has adopted multi-dimensional prevention and control measures such as a diaphragm wall plus an internal support system, layered precipitation and intelligent monitoring, and refined construction. The monitoring results show that the maximum settlement at the pit side is lower than the design limit, which verifies the effectiveness of the measures. Future research can further explore the application of soil improvement technology under complex geological conditions to enhance the settlement control capability of ultra-deep foundation pits.

Journal of Physics Conference SeriesVol. 3021(1)
Zhejiang University of Science and Technology (CN), China Railway Group (China) (CN)
Openalex Percentile: Top 74%
Civil and Geotechnical Engineering Research
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics