Analisis Biaya Dan Waktu Pada Proyek Pembangunan Gedung Dengan Metode Earned Value Pada Proyek Pembangunan Gedung F Universitas Pekalongan

Projects are structured activities conducted within a specific timeframe to achieve defined objectives by utilizing allocated resources.. Projects are also limited by time by the contract agreement. If this is not implemented and handled properly, it will have a negative impact which will ultimately lead to failure to achieve the desired goals and objectives. During the process of achieving these goals, some limitations must be met. The concept of performance value is a method to measure project progress by using three key metrics: BCWS, BCWP, and ACWP. This method calculates the budgeted costs based on the work that has been completed or executed (budgeted costs of the work performed). The research process starts with actualization, data collection, conducting direct project interviews, and synthesizing the outcomes of the collected data. This study aims to determine the estimated cost and time involved, as well as to calculate the cost and time needed to complete the project work. Based on the methodological analysis of the 55th week of the Pekalongan University Building F construction project, the schedule deviation value (SV) is Rp. 0. These results indicate that the work performance reaches 100, compared to the plan. While the Cost Variance (CV) is Rp. 19,693,765,800, these results indicate that the work carried out with the costs used is the same as the planned contract even though it is carried out by an addendum. Project Completion Time (PDT) = 55 weeks estimated, which means it tends to be an additional 8 weeks, whereas completing the project on schedule takes only 47 weeks. Keywords: Income Value Method, ACWP, BCWP, BCWS, SV, CV, ECD

Authors

Publication Details

Journal
Jurnal Teknik Sipil dan Teknologi Konstruksi
Published
2024-10-24
DOI
https://doi.org/10.35308/jts-utu.v10i2.11212
Primary Topic
Management and Optimization Techniques
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Analisis Biaya Dan Waktu Pada Proyek Pembangunan Gedung Dengan Metode Earned Value Pada Proyek Pembangunan Gedung F Universitas Pekalongan

Tisnawati Tisnawati, M. Abdul Malik Annasir, Sabrina Amelia Putri
Jurnal Teknik Sipil dan Teknologi Konstruksi
Management and Optimization Techniques
article

Analisis Biaya Dan Waktu Pada Proyek Pembangunan Gedung Dengan Metode Earned Value Pada Proyek Pembangunan Gedung F Universitas Pekalongan

Tisnawati Tisnawati, M. Abdul Malik Annasir, Sabrina Amelia Putri
article en

Abstract

Projects are structured activities conducted within a specific timeframe to achieve defined objectives by utilizing allocated resources.. Projects are also limited by time by the contract agreement. If this is not implemented and handled properly, it will have a negative impact which will ultimately lead to failure to achieve the desired goals and objectives. During the process of achieving these goals, some limitations must be met. The concept of performance value is a method to measure project progress by using three key metrics: BCWS, BCWP, and ACWP. This method calculates the budgeted costs based on the work that has been completed or executed (budgeted costs of the work performed). The research process starts with actualization, data collection, conducting direct project interviews, and synthesizing the outcomes of the collected data. This study aims to determine the estimated cost and time involved, as well as to calculate the cost and time needed to complete the project work. Based on the methodological analysis of the 55th week of the Pekalongan University Building F construction project, the schedule deviation value (SV) is Rp. 0. These results indicate that the work performance reaches 100, compared to the plan. While the Cost Variance (CV) is Rp. 19,693,765,800, these results indicate that the work carried out with the costs used is the same as the planned contract even though it is carried out by an addendum. Project Completion Time (PDT) = 55 weeks estimated, which means it tends to be an additional 8 weeks, whereas completing the project on schedule takes only 47 weeks. Keywords: Income Value Method, ACWP, BCWP, BCWS, SV, CV, ECD

Jurnal Teknik Sipil dan Teknologi KonstruksiVol. 10(2)
Openalex Percentile: Top 48%
Management and Optimization Techniques
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Analisis Biaya Dan Waktu Pada Proyek Pembangunan Gedung Dengan Metode Earned Value Pada Proyek Pembangunan Gedung F Universitas Pekalongan — Tisnawati Tisnawati, M. Abdul Malik Annasir, et al. · Jurnal Teknik Sipil dan Teknologi Konstruksi (2024) | TGRS Research Map | TGRS