Kontruksi Penanganan Bencana Tanah Longsor di Daerah Jemaat Dok Tujuh Jayapura

The impact of the landslide is very worrying for the entire community and the congregation of Dock Seven because the land has experienced very large erosion and splits from the edge of the river to the wall of the church building which can result in the collapse of the building wall and church tower. For this reason, fast handling is needed to anticipate a greater impact by making gabions reinforced with ironwood as retaining pillars, accompanied by material compaction and re-casting. The purpose of this community service activity is to minimize losses and damage due to landslides, and to restore the function of the road access as a means of community activities every day. The construction of this landslide handling is made simple, namely by installing ironwood pillars along the landslide area starting from the boundary of the church building wall to the edge of the river flow, then placing gabions filled with gravel material from the bottom of the landslide hole to near the ground surface, then filled with coral material and re-cast as road access. For the river bank wall, it is done by casting and installing embankments until it passes the road surface so that the river water does not overflow onto the road when the rainfall is quite high. The gabion used is a type of thick wire measuring 2 m x 1 m x 1 m with a side wire diameter of 3.4 mm, a braided wire diameter of 2.7 mm, a hole/mesh size of 8 cm x 10 cm, a number of turns of 3 and a weight/sheet of 18 Kg. The ironwood used as a support is 5 cm x 5 cm in size. The embankment material uses coral rock, while the casting of the river bank embankment uses a 12 mm iron frame combined with 5 cm x 5 cm ironwood. The height of the embankment from the bottom of the river to the road surface is 3.80 meters where the height from the bottom to the river to the road surface is 3 meters and from the top of the road surface is 80 cm. With the implementation of this landslide handling construction, the entire community and the congregation of Dock Seven can use the road access again for daily needs.

Authors

Institutions

Publication Details

Journal
Jurnal Pengabdian Masyarakat Sains dan Teknologi
Published
2025-03-30
DOI
https://doi.org/10.58169/jpmsaintek.v4i1.762
Primary Topic
Geotechnical and construction materials studies
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Kontruksi Penanganan Bencana Tanah Longsor di Daerah Jemaat Dok Tujuh Jayapura

Bodian Davin Panggabean, Frans Simbol Tambing
Jurnal Pengabdian Masyarakat Sains dan Teknologi
Geotechnical and construction materials studies
article

Kontruksi Penanganan Bencana Tanah Longsor di Daerah Jemaat Dok Tujuh Jayapura

Bodian Davin Panggabean, Frans Simbol Tambing
article en

Abstract

The impact of the landslide is very worrying for the entire community and the congregation of Dock Seven because the land has experienced very large erosion and splits from the edge of the river to the wall of the church building which can result in the collapse of the building wall and church tower. For this reason, fast handling is needed to anticipate a greater impact by making gabions reinforced with ironwood as retaining pillars, accompanied by material compaction and re-casting. The purpose of this community service activity is to minimize losses and damage due to landslides, and to restore the function of the road access as a means of community activities every day. The construction of this landslide handling is made simple, namely by installing ironwood pillars along the landslide area starting from the boundary of the church building wall to the edge of the river flow, then placing gabions filled with gravel material from the bottom of the landslide hole to near the ground surface, then filled with coral material and re-cast as road access. For the river bank wall, it is done by casting and installing embankments until it passes the road surface so that the river water does not overflow onto the road when the rainfall is quite high. The gabion used is a type of thick wire measuring 2 m x 1 m x 1 m with a side wire diameter of 3.4 mm, a braided wire diameter of 2.7 mm, a hole/mesh size of 8 cm x 10 cm, a number of turns of 3 and a weight/sheet of 18 Kg. The ironwood used as a support is 5 cm x 5 cm in size. The embankment material uses coral rock, while the casting of the river bank embankment uses a 12 mm iron frame combined with 5 cm x 5 cm ironwood. The height of the embankment from the bottom of the river to the road surface is 3.80 meters where the height from the bottom to the river to the road surface is 3 meters and from the top of the road surface is 80 cm. With the implementation of this landslide handling construction, the entire community and the congregation of Dock Seven can use the road access again for daily needs.

Jurnal Pengabdian Masyarakat Sains dan TeknologiVol. 4(1)
Cenderawasih University (ID)
Openalex Percentile: Top 87%
Geotechnical and construction materials studies
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.