PETRA III Operational Performance and Availability in 2023
Abstract At DESY the Synchrotron Light Source PETRA III offers scientists outstanding opportunities for experiments with hard X-rays of exceptionally high brilliance since 2009. Parallel to operation with high availability, a comprehensive study program supports hardware and software developments for the forthcoming PETRA IV upgrade. Key aspects in 2023 were the development of commissioning tools and the installation of a prototype PETRA IV 500 MHz Higher Order Mode (HOM) damped cavity. In view of the campus wide infrastructure provisions expected in the next years in parallel to the ongoing beam operation at PETRA III, a series of vibration tests were conducted to assess the impact of anticipated construction activities on beam stability. This paper provides a detailed description of the operation in 2023, reviews the availability and fault statistics and gives an outlook to the next runs.
Authors
- R. Wanzenberg
- Gajendra Sahoo
- J. Keil
- M. Schaumann
Institutions
- Deutsches Elektronen-Synchrotron DESY (DE)
Publication Details
- Journal
- Journal of Physics Conference Series
- Published
- 2025-05-01
- DOI
- https://doi.org/10.1088/1742-6596/3010/1/012030
- Primary Topic
- Nuclear Physics and Applications
- Type
- article
- Field-Weighted Citation Impact
- 0.00