PETRA III Operational Performance and Availability in 2023

Abstract At DESY the Synchrotron Light Source PETRA III offers scientists outstanding opportunities for experiments with hard X-rays of exceptionally high brilliance since 2009. Parallel to operation with high availability, a comprehensive study program supports hardware and software developments for the forthcoming PETRA IV upgrade. Key aspects in 2023 were the development of commissioning tools and the installation of a prototype PETRA IV 500 MHz Higher Order Mode (HOM) damped cavity. In view of the campus wide infrastructure provisions expected in the next years in parallel to the ongoing beam operation at PETRA III, a series of vibration tests were conducted to assess the impact of anticipated construction activities on beam stability. This paper provides a detailed description of the operation in 2023, reviews the availability and fault statistics and gives an outlook to the next runs.

Authors

Institutions

Publication Details

Journal
Journal of Physics Conference Series
Published
2025-05-01
DOI
https://doi.org/10.1088/1742-6596/3010/1/012030
Primary Topic
Nuclear Physics and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

PETRA III Operational Performance and Availability in 2023

R. Wanzenberg, Gajendra Sahoo, J. Keil, M. Schaumann
Journal of Physics Conference Series
Nuclear Physics and Applications
article

PETRA III Operational Performance and Availability in 2023

R. Wanzenberg, Gajendra Sahoo, J. Keil, M. Schaumann
article en

Abstract

Abstract At DESY the Synchrotron Light Source PETRA III offers scientists outstanding opportunities for experiments with hard X-rays of exceptionally high brilliance since 2009. Parallel to operation with high availability, a comprehensive study program supports hardware and software developments for the forthcoming PETRA IV upgrade. Key aspects in 2023 were the development of commissioning tools and the installation of a prototype PETRA IV 500 MHz Higher Order Mode (HOM) damped cavity. In view of the campus wide infrastructure provisions expected in the next years in parallel to the ongoing beam operation at PETRA III, a series of vibration tests were conducted to assess the impact of anticipated construction activities on beam stability. This paper provides a detailed description of the operation in 2023, reviews the availability and fault statistics and gives an outlook to the next runs.

Journal of Physics Conference SeriesVol. 3010(1)
Deutsches Elektronen-Synchrotron DESY (DE)
Openalex Percentile: Top 82%
Nuclear Physics and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.