Implementasi Teknologi LoRA Menggunakan Data Beban Puncak Pada Gardu Distribusi

Transformer monitoring and measurement process at PT. PLN (Persero) at the BR 391 distribution substation is carried out manually during peak load hours in the field, which usually takes place between 18.00-22.00 local time. The peak load hours at distribution substations can vary, whether in the morning, afternoon or evening, sometimes even during the day. Because of this difference, determining peak load hours is still done manually by staff. However, this approach is considered inefficient. Therefore, in this research, we plan to develop a monitoring and data storage system using LoRa technology. This system will enable continuous monitoring of transformers at distribution substations, in contrast to manual methods which are only carried out during certain hours. This technology has been tested at the distribution substation BR 391 Jl. Wijaya Kusuma Medan. Observation results show that peak load hours occur between 18.00-22.00 WIB, with the highest peak load reaching R=20. 983,6 watts, S=17.031,0 watts, and T=21.801,4 watts per phase. The highest daily average power consumption was recorded at 20.00 WIB. Increased load tends to occur at night, with the highest load in the T phase

Authors

Publication Details

Journal
JURNAL AMPLIFIER JURNAL ILMIAH BIDANG TEKNIK ELEKTRO DAN KOMPUTER
Published
2025-04-25
DOI
https://doi.org/10.33369/jamplifier.v15i1.37029
Primary Topic
IoT-based Control Systems
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Implementasi Teknologi LoRA Menggunakan Data Beban Puncak Pada Gardu Distribusi

Purnama Helena T Hutabarat
JURNAL AMPLIFIER JURNAL ILMIAH BIDANG TEKNIK ELEKTRO DAN KOMPUTER
IoT-based Control Systems
article

Implementasi Teknologi LoRA Menggunakan Data Beban Puncak Pada Gardu Distribusi

Purnama Helena T Hutabarat
article en

Abstract

Transformer monitoring and measurement process at PT. PLN (Persero) at the BR 391 distribution substation is carried out manually during peak load hours in the field, which usually takes place between 18.00-22.00 local time. The peak load hours at distribution substations can vary, whether in the morning, afternoon or evening, sometimes even during the day. Because of this difference, determining peak load hours is still done manually by staff. However, this approach is considered inefficient. Therefore, in this research, we plan to develop a monitoring and data storage system using LoRa technology. This system will enable continuous monitoring of transformers at distribution substations, in contrast to manual methods which are only carried out during certain hours. This technology has been tested at the distribution substation BR 391 Jl. Wijaya Kusuma Medan. Observation results show that peak load hours occur between 18.00-22.00 WIB, with the highest peak load reaching R=20. 983,6 watts, S=17.031,0 watts, and T=21.801,4 watts per phase. The highest daily average power consumption was recorded at 20.00 WIB. Increased load tends to occur at night, with the highest load in the T phase

JURNAL AMPLIFIER JURNAL ILMIAH BIDANG TEKNIK ELEKTRO DAN KOMPUTERVol. 15(1)
Openalex Percentile: Top 88%
IoT-based Control Systems
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.