Multi-objective maintenance optimization of contact networks considering integrated state parameters

With the gradual expansion of China's high-speed railroad operation scale and the accumulation of operation time, the pressure of operation and maintenance of contact networks is increasing, and the operation and maintenance strategy of railroad contact networks under the traditional cyclic maintenance mode has the double dilemma of low maintenance efficiency and high labor intensity of maintenance personnel. In order to protect the transportation quality and efficiency of high-speed railroads and reduce the labor intensity of maintenance personnel, this paper proposes a multi-objective optimization operation and maintenance strategy for contact networks considering integrated state parameters, which is able to ensure the high reliability of contact networks while reducing the cost of maintenance and reducing the man-hours required for maintenance. Firstly, according to the integrated state parameters such as the guide height, contact force, pull-out value, and remaining useful life (RUL) of contact networks, the state of contact networks near specific towers is analyzed, revealing the initial reliability of the main equipment including contact wires, positioners, hanging strings, etc., which is used as a parameter of the multi-objective optimal maintenance model. Then, a multi-objective optimal maintenance model is established to achieve the optimization goal of high average reliability of contact networks, low maintenance cost and short required working hours. Finally, the model is solved by the multi-objective optimization algorithm to obtain a series of maintenance solutions in the form of Pareto non-inferior solution sets. Simulation calculations with data from a railroad bureau in southern China yielded that the average reliability of the contact networks system was 0.969, and the maintenance cost was 1,029 thousand yuan, spending 71 man-hours, when the maintenance method generated by the operation and maintenance strategy mentioned in this paper was used. Compared with the traditional maintenance method, the maintenance scheme obtained by the proposed in this paper optimizes the required man-hours and improves the labor productivity while maintaining higher reliability and lowering the maintenance cost.

Authors

Institutions

Publication Details

Journal
PLoS ONE
Published
2025-06-03
DOI
https://doi.org/10.1371/journal.pone.0321384
Citations
1
Primary Topic
Mechanical stress and fatigue analysis
Type
article
Field-Weighted Citation Impact
0.86

Funders

Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Multi-objective maintenance optimization of contact networks considering integrated state parameters

Bingbo Wei, Xinxing Hou, Rui Chi, Zhijian Qu et al.
1 citations
PLoS ONE
Mechanical stress and fatigue analysis
0.86
article

Multi-objective maintenance optimization of contact networks considering integrated state parameters

Bingbo Wei, Xinxing Hou, Rui Chi, Zhijian Qu, Xiaolong Liao
article en
1 citations

Abstract

With the gradual expansion of China's high-speed railroad operation scale and the accumulation of operation time, the pressure of operation and maintenance of contact networks is increasing, and the operation and maintenance strategy of railroad contact networks under the traditional cyclic maintenance mode has the double dilemma of low maintenance efficiency and high labor intensity of maintenance personnel. In order to protect the transportation quality and efficiency of high-speed railroads and reduce the labor intensity of maintenance personnel, this paper proposes a multi-objective optimization operation and maintenance strategy for contact networks considering integrated state parameters, which is able to ensure the high reliability of contact networks while reducing the cost of maintenance and reducing the man-hours required for maintenance. Firstly, according to the integrated state parameters such as the guide height, contact force, pull-out value, and remaining useful life (RUL) of contact networks, the state of contact networks near specific towers is analyzed, revealing the initial reliability of the main equipment including contact wires, positioners, hanging strings, etc., which is used as a parameter of the multi-objective optimal maintenance model. Then, a multi-objective optimal maintenance model is established to achieve the optimization goal of high average reliability of contact networks, low maintenance cost and short required working hours. Finally, the model is solved by the multi-objective optimization algorithm to obtain a series of maintenance solutions in the form of Pareto non-inferior solution sets. Simulation calculations with data from a railroad bureau in southern China yielded that the average reliability of the contact networks system was 0.969, and the maintenance cost was 1,029 thousand yuan, spending 71 man-hours, when the maintenance method generated by the operation and maintenance strategy mentioned in this paper was used. Compared with the traditional maintenance method, the maintenance scheme obtained by the proposed in this paper optimizes the required man-hours and improves the labor productivity while maintaining higher reliability and lowering the maintenance cost.

PLoS ONEVol. 20(6)
East China Jiaotong University (CN)
National Natural Science Foundation of China
Openalex Percentile: Top 30%
Mechanical stress and fatigue analysis
0.86
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.