Delays and Cost Overruns in Infrastructure Projects in Cotabato City, BARMM: Causes, Impacts, and Mitigation Strategies

Delays and cost overruns remain persistent challenges in infrastructure development, especially in fast-growing urban areas like Cotabato City, BARMM. This study investigates the root causes of these issues across both government and private construction projects through a mixed-methods approach. Quantitative data were obtained from structured surveys, while qualitative insights were gathered through interviews with key industry professionals. Analysis using the Relative Importance Index (RII) identified the leading delay factors as material procurement delays (RII = 0.884), poor site supervision (RII = 0.837), and unskilled or insufficient labor (RII = 0.814). For cost overruns, the primary contributors included increase in material costs (RII = 0.902), inflation/economic fluctuations (RII = 0.873), and underestimation of project costs (RII = 0.842). Pearson’s correlation coefficient (r = 0.818) indicated a strong positive relationship between delay and cost overrun factors, confirming their interconnected nature. Thematic analysis supported these findings, revealing recurring issues such as weak project oversight, communication gaps, and limited institutional capacity. Respondents underscored the need for clear contractual terms, early risk identification, and stronger stakeholder coordination. The study recommends the implementation of construction-specific policies to streamline procurement, permitting, and accountability mechanisms—grounded in real project experiences and supported by capacity-building initiatives. These findings contribute to informed policy-making and institutional reform aimed at improving infrastructure delivery and reducing inefficiencies in BARMM.

Authors

Publication Details

Journal
International Journal For Multidisciplinary Research
Published
2025-06-03
DOI
https://doi.org/10.36948/ijfmr.2025.v07i03.46966
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Delays and Cost Overruns in Infrastructure Projects in Cotabato City, BARMM: Causes, Impacts, and Mitigation Strategies

Charlie Taclendo, Randy Asturias, Nashmer Aila Sumail, John Francis Pedroso
International Journal For Multidisciplinary Research
Construction Project Management and Performance
article

Delays and Cost Overruns in Infrastructure Projects in Cotabato City, BARMM: Causes, Impacts, and Mitigation Strategies

Charlie Taclendo, Randy Asturias, Nashmer Aila Sumail, John Francis Pedroso
article en

Abstract

Delays and cost overruns remain persistent challenges in infrastructure development, especially in fast-growing urban areas like Cotabato City, BARMM. This study investigates the root causes of these issues across both government and private construction projects through a mixed-methods approach. Quantitative data were obtained from structured surveys, while qualitative insights were gathered through interviews with key industry professionals. Analysis using the Relative Importance Index (RII) identified the leading delay factors as material procurement delays (RII = 0.884), poor site supervision (RII = 0.837), and unskilled or insufficient labor (RII = 0.814). For cost overruns, the primary contributors included increase in material costs (RII = 0.902), inflation/economic fluctuations (RII = 0.873), and underestimation of project costs (RII = 0.842). Pearson’s correlation coefficient (r = 0.818) indicated a strong positive relationship between delay and cost overrun factors, confirming their interconnected nature. Thematic analysis supported these findings, revealing recurring issues such as weak project oversight, communication gaps, and limited institutional capacity. Respondents underscored the need for clear contractual terms, early risk identification, and stronger stakeholder coordination. The study recommends the implementation of construction-specific policies to streamline procurement, permitting, and accountability mechanisms—grounded in real project experiences and supported by capacity-building initiatives. These findings contribute to informed policy-making and institutional reform aimed at improving infrastructure delivery and reducing inefficiencies in BARMM.

International Journal For Multidisciplinary ResearchVol. 7(3)
Openalex Percentile: Top 86%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Delays and Cost Overruns in Infrastructure Projects in Cotabato City, BARMM: Causes, Impacts, and Mitigation Strategies — Charlie Taclendo, Randy Asturias, et al. · International Journal For Multidisciplinary Research (2025) | TGRS Research Map | TGRS