Construction Delays Due to Weather in Cold Regions: A Two-Stage Structural Equation Modeling and Artificial Neural Network Approach

Significant weather-induced delays often plague construction projects in India’s extremely cold regions, yet comprehensive studies addressing this issue remain scarce. This study aims to fill this gap by identifying key delay factors and proposing mitigation strategies for the construction industry. Through an extensive literature review, 42 delay factors were identified and categorized into four groups. A survey of 83 experts from cold regions was conducted to evaluate these factors’ significance to contractors and subcontractors. Employing exploratory factor analysis (EFA), structural equation modeling (SEM), and artificial neural networks (ANN), the study analyzed the relationships between these factors and ranked their impact. The findings reveal that snowfall, rainfall, and low temperatures are the most significant contributors to delays, with snowfall being the most influential (significance: 1.000), followed by rainfall (0.890) and low temperatures (0.790). This research establishes a risk hierarchy and develops a predictive model to facilitate the proactive scheduling of challenging tasks during favorable seasons. This study advances the understanding of weather-induced delays in India’s cold regions and offers valuable insights for project management in such climates. However, it underscores the importance of clearly articulating its novel contributions to differentiate it within the existing literature on weather-related construction delays.

Authors

Institutions

Publication Details

Journal
Buildings
Published
2025-06-02
DOI
https://doi.org/10.3390/buildings15111916
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Construction Delays Due to Weather in Cold Regions: A Two-Stage Structural Equation Modeling and Artificial Neural Network Approach

Varadhiyagounder Ranganathan Prasath Kumar, Saeed Reza Mohandes, Bankole Awuzie, Pshtiwan Shakor et al.
Buildings
Construction Project Management and Performance
article

Construction Delays Due to Weather in Cold Regions: A Two-Stage Structural Equation Modeling and Artificial Neural Network Approach

Varadhiyagounder Ranganathan Prasath Kumar, Saeed Reza Mohandes, Bankole Awuzie, Pshtiwan Shakor, S. Sathvik, Atul Kumar Singh, Farooq Anjum
article en

Abstract

Significant weather-induced delays often plague construction projects in India’s extremely cold regions, yet comprehensive studies addressing this issue remain scarce. This study aims to fill this gap by identifying key delay factors and proposing mitigation strategies for the construction industry. Through an extensive literature review, 42 delay factors were identified and categorized into four groups. A survey of 83 experts from cold regions was conducted to evaluate these factors’ significance to contractors and subcontractors. Employing exploratory factor analysis (EFA), structural equation modeling (SEM), and artificial neural networks (ANN), the study analyzed the relationships between these factors and ranked their impact. The findings reveal that snowfall, rainfall, and low temperatures are the most significant contributors to delays, with snowfall being the most influential (significance: 1.000), followed by rainfall (0.890) and low temperatures (0.790). This research establishes a risk hierarchy and develops a predictive model to facilitate the proactive scheduling of challenging tasks during favorable seasons. This study advances the understanding of weather-induced delays in India’s cold regions and offers valuable insights for project management in such climates. However, it underscores the importance of clearly articulating its novel contributions to differentiate it within the existing literature on weather-related construction delays.

BuildingsVol. 15(11)
Chandigarh University (IN), SRM Institute of Science and Technology (IN), University of Johannesburg (ZA), University of Manchester (GB), Sulaimani Polytechnic University (IQ), Dr. Hari Singh Gour University (IN)
Openalex Percentile: Top 86%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.