Research on Risk Management of Highway Project under BOT Mode

With the development of modern transport, highway construction is chang-ing day by day, the total mileage of China's highways has jumped to the first in the world, highway has become an important part of transport infrastructure con-struc-tion. Accompanied by the increase in demand for high-quality highway construc-tion, highway construction projects to improve the level of risk man-agement is imperative. In the fast-changing transport technology today, the number, scale, quality, frequency and environmental conditions of highway re-construction and expansion projects are evolving rapidly, which puts forward new requirements for the risk control of highway reconstruction and expansion projects. To deeply explore the risk management of highway construction projects under BOT mode, this paper has sorted out the relevant concepts and theoretical foundations, and applied the Delphi method and other methods to identify and optimize the risk factors of highway projects under BOT mode. On this basis, the risk index system of highway projects under BOT mode is established after com-bining risk classification, and the risk evaluation system is established to facilitate the risk evaluation of the project. Finally, using the case study method, taking the ZL motorway project as an example, the fuzzy comprehensive evalua-tion method of AHP risk evaluation model can effectively carry out the com-prehensive as-sessment and weight calculation of these factors, and carry out the systematic as-sessment and analysis of its risk. Based on the analysis results, relevant sugges-tions and countermeasures are proposed to reduce the risk of motorway construc-tion projects. This study provides certain reference and guidance for the risk management of highway construction projects under BOT mode, and provides useful expe-ri-ence and inspiration for other similar projects.

Authors

Institutions

Publication Details

Journal
Advances in Engineering Research Possibilities and Challenges
Published
2025-05-25
DOI
https://doi.org/10.63313/aerpc.9023
Primary Topic
Public-Private Partnership Projects
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Research on Risk Management of Highway Project under BOT Mode

Tianyu Qing
Advances in Engineering Research Possibilities and Challenges
Public-Private Partnership Projects
article

Research on Risk Management of Highway Project under BOT Mode

Tianyu Qing
article en

Abstract

With the development of modern transport, highway construction is chang-ing day by day, the total mileage of China's highways has jumped to the first in the world, highway has become an important part of transport infrastructure con-struc-tion. Accompanied by the increase in demand for high-quality highway construc-tion, highway construction projects to improve the level of risk man-agement is imperative. In the fast-changing transport technology today, the number, scale, quality, frequency and environmental conditions of highway re-construction and expansion projects are evolving rapidly, which puts forward new requirements for the risk control of highway reconstruction and expansion projects. To deeply explore the risk management of highway construction projects under BOT mode, this paper has sorted out the relevant concepts and theoretical foundations, and applied the Delphi method and other methods to identify and optimize the risk factors of highway projects under BOT mode. On this basis, the risk index system of highway projects under BOT mode is established after com-bining risk classification, and the risk evaluation system is established to facilitate the risk evaluation of the project. Finally, using the case study method, taking the ZL motorway project as an example, the fuzzy comprehensive evalua-tion method of AHP risk evaluation model can effectively carry out the com-prehensive as-sessment and weight calculation of these factors, and carry out the systematic as-sessment and analysis of its risk. Based on the analysis results, relevant sugges-tions and countermeasures are proposed to reduce the risk of motorway construc-tion projects. This study provides certain reference and guidance for the risk management of highway construction projects under BOT mode, and provides useful expe-ri-ence and inspiration for other similar projects.

Advances in Engineering Research Possibilities and ChallengesVol. 1(2)
Southwest Petroleum University (CN)
Openalex Percentile: Top 82%
Public-Private Partnership Projects
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.