Cost overruns of infrastructure projects – distributions, causes and remedies

This paper analyses the accuracy of cost estimates for Swedish transport infrastructure projects 2004–2022, discusses causes of cost overruns, and suggests remedies. Cost estimates for all projects in the national investment plans 2010–2022 are tracked from early planning to completion. Final costs for all projects finished 2004–2022 are compared to decision-to-build cost estimates. Results show considerable cost escalation during the planning stages, on average, while cost estimates at the decision-to-build are close to final costs, on average. Cost escalations during the planning stage are not uniform, however: the distribution of cost changes is highly skewed with a long right tail. The reason that final costs tend to exceed early cost estimates is that project decisions are effectively locked in before projects’ costs and benefits have been thoroughly assessed. Lock-in of premature decisions does not only cause cost overruns; even worse, it distorts project selection and design, reduces incentives to search for more cost-efficient designs, and increases opportunities and incentives for project beneficiaries to underestimate costs and overestimate benefits. Several ways to tackle these problems are suggested.

Authors

Institutions

Publication Details

Journal
Transportation Research Part A Policy and Practice
Published
2025-06-02
DOI
https://doi.org/10.1016/j.tra.2025.104532
Citations
4
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
8.43
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Cost overruns of infrastructure projects – distributions, causes and remedies

Jonas Eliasson
4 citations
Transportation Research Part A Policy and Practice
Construction Project Management and Performance
8.43
article

Cost overruns of infrastructure projects – distributions, causes and remedies

Jonas Eliasson
article en
4 citations

Abstract

This paper analyses the accuracy of cost estimates for Swedish transport infrastructure projects 2004–2022, discusses causes of cost overruns, and suggests remedies. Cost estimates for all projects in the national investment plans 2010–2022 are tracked from early planning to completion. Final costs for all projects finished 2004–2022 are compared to decision-to-build cost estimates. Results show considerable cost escalation during the planning stages, on average, while cost estimates at the decision-to-build are close to final costs, on average. Cost escalations during the planning stage are not uniform, however: the distribution of cost changes is highly skewed with a long right tail. The reason that final costs tend to exceed early cost estimates is that project decisions are effectively locked in before projects’ costs and benefits have been thoroughly assessed. Lock-in of premature decisions does not only cause cost overruns; even worse, it distorts project selection and design, reduces incentives to search for more cost-efficient designs, and increases opportunities and incentives for project beneficiaries to underestimate costs and overestimate benefits. Several ways to tackle these problems are suggested.

Transportation Research Part A Policy and PracticeVol. 198
Linköping University (SE), Swedish Transport Administration (SE)
Industry, innovation and infrastructure
Openalex Percentile: Top 3%
Construction Project Management and Performance
8.43
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.