Strategy for Determining Priority of Production Material Inventory with AHP Topsis and Monte Carlo Integration in Metal Stamping Industry

Research objectives Determine the priority of material inventory that needs special attention compared to other inventories so that there is no shortage or overstock of production materials, and ensure the optimal amount of inventory so that the material reordering process can be carried out properly and efficiently. This study uses a quantitative descriptive method using the AHP calculation. The prediction results show that scenario 2 has an accuracy rate of 92%, so it is chosen as a reference. The number of orders based on scenario 2 is 605,433 KGM for January, 676,097 KGM for February, and 549,784 KGM for March.

Authors

Institutions

Publication Details

Journal
Amkop Management Accounting Review.
Published
2025-05-30
DOI
https://doi.org/10.37531/amar.v5i1.2537
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Strategy for Determining Priority of Production Material Inventory with AHP Topsis and Monte Carlo Integration in Metal Stamping Industry

Dendi P. Ishak, Ayu Novitasari
Amkop Management Accounting Review.
Manufacturing Process and Optimization
article

Strategy for Determining Priority of Production Material Inventory with AHP Topsis and Monte Carlo Integration in Metal Stamping Industry

Dendi P. Ishak, Ayu Novitasari
article en

Abstract

Research objectives Determine the priority of material inventory that needs special attention compared to other inventories so that there is no shortage or overstock of production materials, and ensure the optimal amount of inventory so that the material reordering process can be carried out properly and efficiently. This study uses a quantitative descriptive method using the AHP calculation. The prediction results show that scenario 2 has an accuracy rate of 92%, so it is chosen as a reference. The number of orders based on scenario 2 is 605,433 KGM for January, 676,097 KGM for February, and 549,784 KGM for March.

Amkop Management Accounting Review.Vol. 5(1)
University of Indonesia (ID)
Openalex Percentile: Top 83%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Strategy for Determining Priority of Production Material Inventory with AHP Topsis and Monte Carlo Integration in Metal Stamping Industry — Dendi P. Ishak, Ayu Novitasari · Amkop Management Accounting Review. (2025) | TGRS Research Map | TGRS