BIM-enabled prefabricated modular construction: Feasibility and structural insights

This study investigates the feasibility and efficiency of integrating prefabricated construction elements with Building Information Modeling (BIM) in modular construction practices. Using Autodesk Revit, Tekla Structures, and Navisworks, the research simulates the digital modeling, structural assembly, and 4D sequencing of steel frames, precast concrete panels, and joint systems. Findings reveal that BIM significantly enhances dimensional accuracy, reduces on-site construction time by up to 50%, and ensures preemptive resolution of design clashes. All major components modeled in the BIM environment remained within Indian Standard (IS) tolerance limits, and bolted and grouted joints showed reliable alignment in simulations. Additionally, the implementation of 4D BIM enabled dynamic scheduling and workflow optimization, proving superior to conventional methods.

Authors

Publication Details

Journal
International Journal of Civil Engineering and Construction
Published
2025-01-01
DOI
https://doi.org/10.22271/27078329.2025.v4.i1a.42
Primary Topic
BIM and Construction Integration
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

BIM-enabled prefabricated modular construction: Feasibility and structural insights

S. Pannu, Jitender Hooda
International Journal of Civil Engineering and Construction
BIM and Construction Integration
article

BIM-enabled prefabricated modular construction: Feasibility and structural insights

S. Pannu, Jitender Hooda
article en

Abstract

This study investigates the feasibility and efficiency of integrating prefabricated construction elements with Building Information Modeling (BIM) in modular construction practices. Using Autodesk Revit, Tekla Structures, and Navisworks, the research simulates the digital modeling, structural assembly, and 4D sequencing of steel frames, precast concrete panels, and joint systems. Findings reveal that BIM significantly enhances dimensional accuracy, reduces on-site construction time by up to 50%, and ensures preemptive resolution of design clashes. All major components modeled in the BIM environment remained within Indian Standard (IS) tolerance limits, and bolted and grouted joints showed reliable alignment in simulations. Additionally, the implementation of 4D BIM enabled dynamic scheduling and workflow optimization, proving superior to conventional methods.

International Journal of Civil Engineering and ConstructionVol. 4(1)
Openalex Percentile: Top 88%
BIM and Construction Integration
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.