Warm-up Time Estimation in case of Failure for the S<sup>3</sup>FEL Accelerator Cryogenic System

Abstract Shenzhen Superconducting Soft X-Ray Free Electron Laser (S 3 FEL) is under construction in Shenzhen, China by the Institute of Advanced Science Facilities (IASF). The cryogenic system is one of the most important systems in S3FEL, which provides a cryogenic environment for the superconducting accelerator. Once the cryogenic system shuts down in case of failure, the superconducting accelerator will stop running. Then, the pressure in the accelerator pipes will increase, which maybe caused safety valve jumping or cryogenic lines breaking. The warm up time from operation pressure to the specified relief pressure is helpful to select reasonable relief pressure and protective measures. In the present work, the calculations of the warm up time with different liquid helium levels under four specific operational faults and two initial conditions are conducted. In a case of liquid helium level with 70%, the warm up time of upstream and downstream were about 6.8 hours and 10.9 hours at an initial condition of 2 K superfluid helium, while they were about 4 hours and 6.1 hours at an initial condition of 4.5 K saturated liquid helium. The difference between upstream and downstream warm up time was mainly caused by the different lengths of cryogenic transfer line. Moreover, the variations of liquid helium level with time at a specified condition were also calculated. The results presented in this paper will provide useful information for the cryogenic system safety design and accelerator operation modes.

Authors

Institutions

Publication Details

Journal
IOP Conference Series Materials Science and Engineering
Published
2025-05-01
DOI
https://doi.org/10.1088/1757-899x/1327/1/012023
Primary Topic
Superconducting Materials and Applications
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

Warm-up Time Estimation in case of Failure for the S3FEL Accelerator Cryogenic System

Xinbo Dong, Guanglong Cui, J. Dong, Yaqiong Wang et al.
IOP Conference Series Materials Science and Engineering
Superconducting Materials and Applications
article

Warm-up Time Estimation in case of Failure for the S3FEL Accelerator Cryogenic System

Xinbo Dong, Guanglong Cui, J. Dong, Yaqiong Wang, Xilong Wang, Yilun Liu
article en

Abstract

Abstract Shenzhen Superconducting Soft X-Ray Free Electron Laser (S 3 FEL) is under construction in Shenzhen, China by the Institute of Advanced Science Facilities (IASF). The cryogenic system is one of the most important systems in S3FEL, which provides a cryogenic environment for the superconducting accelerator. Once the cryogenic system shuts down in case of failure, the superconducting accelerator will stop running. Then, the pressure in the accelerator pipes will increase, which maybe caused safety valve jumping or cryogenic lines breaking. The warm up time from operation pressure to the specified relief pressure is helpful to select reasonable relief pressure and protective measures. In the present work, the calculations of the warm up time with different liquid helium levels under four specific operational faults and two initial conditions are conducted. In a case of liquid helium level with 70%, the warm up time of upstream and downstream were about 6.8 hours and 10.9 hours at an initial condition of 2 K superfluid helium, while they were about 4 hours and 6.1 hours at an initial condition of 4.5 K saturated liquid helium. The difference between upstream and downstream warm up time was mainly caused by the different lengths of cryogenic transfer line. Moreover, the variations of liquid helium level with time at a specified condition were also calculated. The results presented in this paper will provide useful information for the cryogenic system safety design and accelerator operation modes.

IOP Conference Series Materials Science and EngineeringVol. 1327(1)
Institute of Advanced Light Source Facilities Shenzhen (CN)
Openalex Percentile: Top 79%
Superconducting Materials and Applications
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

Warm-up Time Estimation in case of Failure for the S<sup>3</sup>FEL Accelerator Cryogenic System — Xinbo Dong, Guanglong Cui, et al. · IOP Conference Series Materials Science and Engineering (2025) | TGRS Research Map | TGRS