IDENTIFICATION OF PRODUCTIVITY VALUES USING THE METHOD PRODUCTIVITY DELAY MODEL ON WALLER BEAM WORK

Productivity can be interpreted as a comparison between physical output and real output with the actual input. This research aims to identify labor productivity on waller beam installation work in construction projects using the Method Productivity Delay Model (MPDM). The research method is carried out by conducting direct observations in the field and collecting productivity data using MPDM which is applied through delay analysis in the production cycle, techniques for evaluating work team balance and ensuring optimal labor allocation. The results showed that several factors, such as the environment contributing to the waller beam installation contributed 0.04, equipment factor contributed 0.21, labor factor contributed 0.36, material factor contributed 0.15, and management by 0.02 contributed to the delay and lower productivity. Ideal productivity was obtained at 1.737 units/s, overall productivity at 1.486 units/s, and % Achieved Productivity based on Ideal Productivity at 85.54%. In addition, the findings also emphasize the importance of proactive planning and real-time monitoring to reduce productivity losses and improve construction project performance.

Authors

Institutions

Publication Details

Journal
Jurnal PenSil
Published
2025-05-30
DOI
https://doi.org/10.21009/jpensil.v14i2.53988
Primary Topic
Manufacturing Process and Optimization
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

IDENTIFICATION OF PRODUCTIVITY VALUES USING THE METHOD PRODUCTIVITY DELAY MODEL ON WALLER BEAM WORK

Ryobi Irfanto, Melvin Yeremia
Jurnal PenSil
Manufacturing Process and Optimization
article

IDENTIFICATION OF PRODUCTIVITY VALUES USING THE METHOD PRODUCTIVITY DELAY MODEL ON WALLER BEAM WORK

Ryobi Irfanto, Melvin Yeremia
article en

Abstract

Productivity can be interpreted as a comparison between physical output and real output with the actual input. This research aims to identify labor productivity on waller beam installation work in construction projects using the Method Productivity Delay Model (MPDM). The research method is carried out by conducting direct observations in the field and collecting productivity data using MPDM which is applied through delay analysis in the production cycle, techniques for evaluating work team balance and ensuring optimal labor allocation. The results showed that several factors, such as the environment contributing to the waller beam installation contributed 0.04, equipment factor contributed 0.21, labor factor contributed 0.36, material factor contributed 0.15, and management by 0.02 contributed to the delay and lower productivity. Ideal productivity was obtained at 1.737 units/s, overall productivity at 1.486 units/s, and % Achieved Productivity based on Ideal Productivity at 85.54%. In addition, the findings also emphasize the importance of proactive planning and real-time monitoring to reduce productivity losses and improve construction project performance.

Jurnal PenSilVol. 14(2)
Krida Wacana Christian University (ID)
Openalex Percentile: Top 84%
Manufacturing Process and Optimization
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.

IDENTIFICATION OF PRODUCTIVITY VALUES USING THE METHOD PRODUCTIVITY DELAY MODEL ON WALLER BEAM WORK — Ryobi Irfanto, Melvin Yeremia · Jurnal PenSil (2025) | TGRS Research Map | TGRS