COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHOD

Labor productivity is the main parameter in the success of a construction job. This study aims to analyze the level of productivity and the level of Labor Utilization Rate (LUR) in plastering work using the work sampling method, and the most effective time correlation between morning and afternoon. This research was conducted by direct observation for 3 days. The results showed that the highest productivity value was 14.30 m²/hour in the afternoon, and the lowest productivity value was 6.86 m²/hour in the morning. The Labor Utilization Rate (LUR) values in the morning and afternoon were 57.9% and 65.9%, indicating that the afternoon time was more effective than the morning time. However, there was a significant difference in productivity between morning and afternoon time overall, and it can still be categorized as effective with a Labor Utilization Rate (LUR) value of 61.9%, which exceeds 50%.

Authors

Institutions

Publication Details

Journal
Jurnal PenSil
Published
2025-05-30
DOI
https://doi.org/10.21009/jpensil.v14i2.54314
Primary Topic
Occupational Health and Safety Management
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHOD

Rena Misliniyati, Fepy Supriani, Lindung Zalbuin Mase, Hardiansyah ‎Hardiansyah et al.
Jurnal PenSil
Occupational Health and Safety Management
article

COMPARATIVE ANALYSIS OF PLASTERING WORK EXECUTION TIME ON LABOUR PRODUCTIVITY WITH WORK SAMPLING METHOD

Rena Misliniyati, Fepy Supriani, Lindung Zalbuin Mase, Hardiansyah ‎Hardiansyah, Dwi Susanti
article en

Abstract

Labor productivity is the main parameter in the success of a construction job. This study aims to analyze the level of productivity and the level of Labor Utilization Rate (LUR) in plastering work using the work sampling method, and the most effective time correlation between morning and afternoon. This research was conducted by direct observation for 3 days. The results showed that the highest productivity value was 14.30 m²/hour in the afternoon, and the lowest productivity value was 6.86 m²/hour in the morning. The Labor Utilization Rate (LUR) values in the morning and afternoon were 57.9% and 65.9%, indicating that the afternoon time was more effective than the morning time. However, there was a significant difference in productivity between morning and afternoon time overall, and it can still be categorized as effective with a Labor Utilization Rate (LUR) value of 61.9%, which exceeds 50%.

Jurnal PenSilVol. 14(2)
University of Bengkulu (ID)
Openalex Percentile: Top 82%
Occupational Health and Safety Management
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.