OS IMPACTOS NA EXECUÇÃO DE OBRAS RESIDENCIAIS DE ALTO PADRÃO: ANÁLISE DA IMPORTÂNCIA DA COMPATIBILIZAÇÃO DE PROJETOS

The study analyzes the impacts of the compatibility of executive and complementary projects in the construction of high-end residences, aiming at quality and safety for users. The research seeks to understand the stages of execution of the work, identify the problems caused by the lack of compatibility and find digital tools to optimize the process. The methodology uses a bibliographic review and case studies of high-end residential projects with compatibility problems, to identify common errors and their consequences. The results show that the lack of alignment between plumbing and electrical projects resulted in difficulties in execution, the need for rework and compromised structural safety. The research concludes that efficient project compatibility is crucial to avoid errors, waste and rework, promoting greater satisfaction and longevity for buildings.

Authors

Publication Details

Journal
Revista fisio&terapia.
Published
2025-05-30
DOI
https://doi.org/10.69849/revistaft/fa10202505302259
Primary Topic
Construction Project Management and Performance
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

OS IMPACTOS NA EXECUÇÃO DE OBRAS RESIDENCIAIS DE ALTO PADRÃO: ANÁLISE DA IMPORTÂNCIA DA COMPATIBILIZAÇÃO DE PROJETOS

Edinalva Farias Brito, Lucas Ruan Gomes Pessoa, Glêison Augusto dos Santos
Revista fisio&terapia.
Construction Project Management and Performance
article

OS IMPACTOS NA EXECUÇÃO DE OBRAS RESIDENCIAIS DE ALTO PADRÃO: ANÁLISE DA IMPORTÂNCIA DA COMPATIBILIZAÇÃO DE PROJETOS

Edinalva Farias Brito, Lucas Ruan Gomes Pessoa, Glêison Augusto dos Santos
article en

Abstract

The study analyzes the impacts of the compatibility of executive and complementary projects in the construction of high-end residences, aiming at quality and safety for users. The research seeks to understand the stages of execution of the work, identify the problems caused by the lack of compatibility and find digital tools to optimize the process. The methodology uses a bibliographic review and case studies of high-end residential projects with compatibility problems, to identify common errors and their consequences. The results show that the lack of alignment between plumbing and electrical projects resulted in difficulties in execution, the need for rework and compromised structural safety. The research concludes that efficient project compatibility is crucial to avoid errors, waste and rework, promoting greater satisfaction and longevity for buildings.

Revista fisio&terapia.Vol. 29(146)
Openalex Percentile: Top 86%
Construction Project Management and Performance
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.