HAIFA BREAKWATER RETROFIT DESIGN

Haifa Port is Israel’s largest commercial port and is a vital gateway for international trade and commerce. The Existing Main Breakwater (“EMBW”) is comprised of two parts: the original breakwater that was built in the 1930s (“British MBW”) and an extension that was built in the 1980s (“Carmel MBW”). This breakwater section has deteriorated over the years and is subject to regular overtopping during storm events. In addition the stone used for the British MBW has deteriorated and neither the British MBW nor Carmel MBW were designed to resist current wave or seismic loading. Furthermore, the frequency and intensity of large storms are increasing, and therefore, and this coupled with the deterioration to date results in repairs being required on a more frequently basis. IPC retained HPA Engineers, P.C. (HPA) to carry out the planning and design of the retrofit alternatives for both breakwaters. The main objective of this study was to develop various retrofit options for 12.5-yr, 25-yr, and 50-yr design life, considering conventional rock armor and concrete armor units. The three design life alternatives were evaluated by considering six key factors: life-cycle cost, seismic resistance, effect on Navy and other harborside operations, environmental issues, sustainability, and construction schedule.

Authors

Publication Details

Journal
Coastal Engineering Proceedings
Published
2025-05-29
DOI
https://doi.org/10.9753/icce.v38.structures.33
Primary Topic
Wastewater Treatment and Reuse
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

HAIFA BREAKWATER RETROFIT DESIGN

Bill Paparis, Daniela Ostrovsky, Atilla Bayram
Coastal Engineering Proceedings
Wastewater Treatment and Reuse
article

HAIFA BREAKWATER RETROFIT DESIGN

Bill Paparis, Daniela Ostrovsky, Atilla Bayram
article en

Abstract

Haifa Port is Israel’s largest commercial port and is a vital gateway for international trade and commerce. The Existing Main Breakwater (“EMBW”) is comprised of two parts: the original breakwater that was built in the 1930s (“British MBW”) and an extension that was built in the 1980s (“Carmel MBW”). This breakwater section has deteriorated over the years and is subject to regular overtopping during storm events. In addition the stone used for the British MBW has deteriorated and neither the British MBW nor Carmel MBW were designed to resist current wave or seismic loading. Furthermore, the frequency and intensity of large storms are increasing, and therefore, and this coupled with the deterioration to date results in repairs being required on a more frequently basis. IPC retained HPA Engineers, P.C. (HPA) to carry out the planning and design of the retrofit alternatives for both breakwaters. The main objective of this study was to develop various retrofit options for 12.5-yr, 25-yr, and 50-yr design life, considering conventional rock armor and concrete armor units. The three design life alternatives were evaluated by considering six key factors: life-cycle cost, seismic resistance, effect on Navy and other harborside operations, environmental issues, sustainability, and construction schedule.

Coastal Engineering Proceedings(38)
Openalex Percentile: Top 81%
Wastewater Treatment and Reuse
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.