ANALYSES OF HYDRODYNAMIC AND TYPHOON WAVE LOADINGS FOR THE SUBSTRUCTURE SCOUR PROTECTION DESIGN OF PANGUIL BAY BRIDGE PROJECT

Panguil Bay Bridge is a national coastal bridge infrastructure project of the Department of Public Works and Highways (DPWH), Philippines national roads and infrastructure agency, that will connect via road transport the towns of Tubod, Lanao del Norte and Tangub, Misamis Occidental. The bridge project consists of 320m length of the main bridge, 1,920m of approach bridge, 861m of approach road section, yielding a total length of 3,101m which surpasses the previously longest 2.1-km- long San Juanico Bridge. The bridge superstructure is supported by 32 piers consisting of 2 main pylon piers for navigation passage, 2 supporting piers, and 28 single piers distributed on both sides of the Panguil Bay Channel. The objective of this paper is to present a methodology and the results of its application to the determination of the hydrodynamic and storm wave loadings required in the design of the marine scour protection of this coastal bridge’s substructure.

Authors

Publication Details

Journal
Coastal Engineering Proceedings
Published
2025-05-29
DOI
https://doi.org/10.9753/icce.v38.structures.112
Primary Topic
Hydraulic flow and structures
Type
article
Field-Weighted Citation Impact
0.00
Controls
|||
ALL TIME
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
article

ANALYSES OF HYDRODYNAMIC AND TYPHOON WAVE LOADINGS FOR THE SUBSTRUCTURE SCOUR PROTECTION DESIGN OF PANGUIL BAY BRIDGE PROJECT

Eric C. Cruz
Coastal Engineering Proceedings
Hydraulic flow and structures
article

ANALYSES OF HYDRODYNAMIC AND TYPHOON WAVE LOADINGS FOR THE SUBSTRUCTURE SCOUR PROTECTION DESIGN OF PANGUIL BAY BRIDGE PROJECT

Eric C. Cruz
article en

Abstract

Panguil Bay Bridge is a national coastal bridge infrastructure project of the Department of Public Works and Highways (DPWH), Philippines national roads and infrastructure agency, that will connect via road transport the towns of Tubod, Lanao del Norte and Tangub, Misamis Occidental. The bridge project consists of 320m length of the main bridge, 1,920m of approach bridge, 861m of approach road section, yielding a total length of 3,101m which surpasses the previously longest 2.1-km- long San Juanico Bridge. The bridge superstructure is supported by 32 piers consisting of 2 main pylon piers for navigation passage, 2 supporting piers, and 28 single piers distributed on both sides of the Panguil Bay Channel. The objective of this paper is to present a methodology and the results of its application to the determination of the hydrodynamic and storm wave loadings required in the design of the marine scour protection of this coastal bridge’s substructure.

Coastal Engineering Proceedings(38)
Openalex Percentile: Top 73%
Hydraulic flow and structures
AI Navigator

Ask Laika to Summarize, Analyze, and Connect papers live on the map.

Summarize Papers & Methodologies

Extract key findings, datasets, and comparative methods across publications.

Benchmark Rankings & Visual Analytics

Rank top research institutions, authors, funders, topics, and journals by Field-Weighted Citation Impact (FWCI) and paper volume with instant charts.

Connect Distant Disciplines

Bridge topological clusters on the map to find hidden collaborative intersections.